BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2025 at 8:00 PM

Updated May 20, 2025

Site work for a road / highway in Maple Creek, California. Completed plans call for site work for a road / highway.

The Department of Transportation (Department) will receive quotes for Construction on State Highway in Humboldt County near Orick from 0.5 mile south of McDonald Creek Road to 1.3 mile north of Redwood Creek Trails Lane Submit and view bidders inquiries to the District at: CALTRANS North Region Construction Office E-MAIL: inquiry.nr.bid@dot.ca.gov Prime Contractor must have either a Class A license or an applicable Class C license. No pre-bid meeting is scheduled for this project. Department establishes no DVBE Contract goal but encourages bidders to obtain DVBE participation. Bids must be on a unit price basis. Complete the work within 35 working days. The estimated cost of the project is $383,000.00. DO NOT SEND A HARD COPY BID TO THE DIVISION OF PROCUREMENT & CONTRACTS. IT WILL NOT BE ACCEPTED. If your bid is over $461,000.00 it will be rejected per Public Contract Code 10105(b). Payment Bonds and Insurance will be required at time of Award if your Company is low bidder and awarded the contract. Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests. There will be no public opening of quotes. Quotes results will not be listed on the Internet. Request quote results at: Analyst's Name: Tammy Tran Email: tammy.p.tran@dot.ca.gov Phone: (279) 599-7880 District office addresses are provided in the Standard Specifications

Post-Bid

Roads / Highways

$383,000.00

Public - State/Provincial

Site Work

48

8

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
4
Bidding Soon
112
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2025

June 6, 2025

Project location map

Multiple Locations, Maple Creek, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.