BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated July 18, 2025

Renovation of a mixed-use development in Chesterfield, Missouri. Completed plans call for the renovation of a educational facility.

Fluid Applied Roofing Services #2 at Green Trails Elementary, Wren Hollow Elementary, Claymont Elementary, Shenandoah Valley Elementary and West High School IT IS ANTICIPATED THAT THE SUCCESSFUL BIDDER WILL BE GIVEN NOTICE TO Questions Due Date: May 7th 2025, 3:00 PM CDT PROCEED JUNE 12,+2025+AND MAY START IN FIELD ON JUNE30, 2025 WITH SUBSTANTIAL COMPLETION TO OCCUR ON OR BEFORE NOVEMBER15, 2025 DESCRIPTION OF THE WORK A. Scope of demolition and removal work is indicated on drawings. B. Scope of alterations work is indicated on drawings. C. The Work includes, but is not limited to: 1. Roof preparation per manufacturer's recommendations including repair of damaged roof areas and sealing of cracks and crevices prior to application 2. Installation of fluid applied membrane roofing base coat per manufacturer recommendations. 3. Installation of fluid applied membrane roofing top coat per manufacturer recommendations.. 4. Install fluid applied roofing over existing walk pads and identify walk way with black granuals in the top coat. 5. Provide minimum 25 year leak proof warranty on all roof systems. 6. Provide Preconstruction Testing and Report prior to the start of work. See Section 070150.19 - Preparation for Re-Roofing D. The project will be bid in multiple bid packages, but it is the intent of the Owner to award all bid packages that are less or equal to the project funding in total to one prime contractor. Bid Package descriptions are as follows: 1. Combination Bid: Bid Packages 1 through 5: a. In the event all bid packages combined are less or below the project budget, the Owner intends to award the combination bid to one prime contractor to provide all the work denoted on the drawings as described for Bid Packages 1 - 5. 2. Bid Package 1: Claymont Elementary School a. Fluid Applied Roofing (see Section 075600) is to be applied to ROF-001, ROF-003 thru ROF-007, ROF-012 thru ROF-014 as per drawings. NOTE: ROF-001 Roof expansion joint needs to be replaced or repaired. All coated roofs need new drain inserts and repair any flashing, downspouts and gutters where applicable. Summary 011000 - 2 PN002408B Fluid Applied Roofing FY24-25 (2) Various Locations District Wide b. Please see General Notes on drawings for ROF-001 expansion joint detail. c. Please coordinate with Straight-Up Solar, to allow them to remove solar panels from ROF-007, prior to any work done on this roof. 3. Bid Package 2: Green Trails Elementary School a. Fluid Applied Roofing (see Section 075600) is to be applied to ROF-005 thru ROF007 as per drawings 4. Bid Package 3: Shenandoah Valley Elementary School a. Fluid Applied Roofing (see Section 075600) is to be applied to ROF-016 b. NOTE: Please coordinate with Straight-Up Solar, to allow them to remove solar panels from ROF-016, prior to any work done on this roof. c. Fence style Snow Guards compatible for PVC Membrane roofing to be installed on ROF-001 d. Fence style Snow Guards compatible for Metal roofing to be installed on ROF-005 5. Bid Package 4: Wren Hollow Elementary School a. Fluid Applied Roofing (see Section 075600) is to be appled to ROF-001, ROF-002, ROF-004, ROF-007, ROF-008, ROF-013 thru ROF-016 as per drawings. b. Please coordinate with Straight-Up Solar, to allow them to remove solar panels from ROF-007 and ROF-008, prior to any work done on this roof. 6. Bid Package 5: West High School a. Fluid Applied Roofing (see Section 075600) is to be applied to ROF-005, ROF-006, ROF-008, ROF-010, ROF-012, ROF-014, ROF-016, ROF-018 thru ROF-023, ROF027 thru ROF-029 and ROF-035 as per drawings. b. NOTE: ROF-016, Metal caps on 15 designated raised pylons need to be removed and infilled with plywood and torch down applied, prior to coating. c. PVC Membrane Roofing to be installed on ROF-013, and to the outer west side section of ROF-35 to the side of ROF-015. d. NOTE: ROF-013. Mod Bit to be completely removed. Cover Board and Insulation to be removed in damaged roof area and replaced back. e. Metal roof on ROF-015 to be removed, and be replaced with PVC membrane roofing. Owner has awarded a contract for abatement of asbestos containing materials. 1. The asbestos management plans are available for inspection from 8:00 a.m. to 4:00 p.m. Monday through Friday at the Owner's Environmental Group offices located at the District Operations Building, 363 North Woods Mill Road, Chesterfield, Missouri 63017. 2. The asbestos management plans are available while performing the work during normal work hours at the Administrative Offices of the facility at which the work is to be completed. Intent to Bid by May 14, 2025 1:30 PM CDT.

Award

Educational

$2,056,474.00

Public - County

Renovation

7

10

8

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
114
Bidding Soon
1,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

June 12, 2025

Project location map

Multiple Locations, Chesterfield, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.