Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 15, 2025 at 8:00 PM
Updated May 16, 2025
Site work for a road / highway in Bowling Green, Kentucky. Completed plans call for site work for a road / highway.
Traffic Signal Mast Arm Pole Painting US31W / US 68X (Kentucky Street). The City of Bowling Green, KY is soliciting bids from qualified contractors for the preparation and repainting of traffic signal mast arm poles at multiple intersections along US68X and 31W, as detailed in the attached specifications document. The scope of work includes providing traffic control, surface preparation, application of rust-inhibitor treatments, and painting of the traffic signal poles. The City of Bowling Green, Kentucky reserves the right to reject any and all bids received, and to select that bid which it determines to be in its best interest. The award of this bid will be made on the basis of the Lowest Bid Price as permitted in KRS 45A.365. Notice to Proceed June 2, 2025 (Pending contract documents) Final Completion Date August 29, 2025 Please refer all questions or comments to: Please send a copy in writing to Meghan Vanmeter, Procurement Manager (email purchasing@bgky.org). The deadline for questions is April 24, 2025. Bid date notes : Respondents are to submit their bid in a clearly marked sealed envelope. The clearly marked sealed envelope shall include the bid number and description listed above. Make sure the shipping envelope has bid number listed clearly on the outside as well. The City of Bowling Green, Kentucky is not responsible for the premature opening of, or the failure to open, a sealed bid not properly addressed or identified. 1. Surface Preparation: o Thoroughly clean all surfaces to be painted, removing dirt, oils, grease, loose paint, and contaminants. o Prepare surfaces in accordance with SSPC-SP3 to remove all loose rust, scale, paint, and other non-adherent materials. o Surfaces must be clean and dry prior to coating application. o Areas exhibiting active corrosion shall be treated with an approved rust converter, if necessary, prior to priming. Recommended rust inhibitors include PPG Pitt-Tech(R) Plus Rust Inhibitive Primer, Corroseal(R), or an approved equivalent. 2. Sign and Equipment Handling: o Signs attached to poles with screws shall be temporarily removed, stored safely, and reinstalled after painting. Painting shall cover the areas behind these signs. o Traffic signal heads, pedestrian signal heads, cameras, sensors, and any equipment attached by astro brackets and/or banding shall remain in place. Painting shall be completed around these items without removing them. 3. Paint Application Method: o Due to high traffic volume and to minimize overspray risk, the painting method shall be limited exclusively to brush and roller application. o Spray painting is strictly prohibited. Pole Locations: o US31W Bypass @ 10th Ave - 4 Poles - 1 Arm Each o US31W @ Lehman Ave - 2 Poles - 2 Arms Each o US68X (Kentucky St) @ 11th Ave - 1 Pole - 2 Arms o US68X (Kentucky St) @ 12th Ave - 2 Poles (1 with 2 Arms, 1 with 1 Arm) o US68X (Kentucky St) @ Main Ave - 2 Poles (1 with 2 Arms, 1 with 1 Arm)
Bid Results
Roads / Highways
$26,400.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 7, 2025
June 2, 2025
Multiple Locations, Bowling Green, KY
Related To This Project
Bowling Green, KY
--
Bowling Green, KY
--
Bowling Green, KY
Bid Date: May 28 2025
Bowling Green, KY
Bid Date: Jun 30 2025
Bowling Green, KY
Bid Date: Sep 02 2020
Bowling Green, KY
Bid Date: Jun 10 2020
Bowling Green, KY
--
Bowling Green, KY
Bid Date: May 28 2025
Bowling Green, KY
Bid Date: May 21 2025
Bowling Green, KY
Bid Date: May 14 2025
Bowling Green, KY
Bid Date: May 08 2025
Bowling Green, KY
Bid Date: May 06 2025
Bowling Green, KY
Bid Date: Apr 28 2025
Bowling Green, KY
Bid Date: Apr 30 2025
Bowling Green, KY
Bid Date: Apr 29 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
