BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work for a road / highway in Missoula, Montana. Completed plans call for site work for a road / highway.

GAOA Western Montana District Roads The Department of Interior, Bureau of Land Management (BLM), Montana State Office intends to solicit proposals for road maintenance of BLM roads 4601 Rattler Gulch, 4608 Mulkey Gulch and adjacent BLM roads. Road maintenance includes but is not limited to clearing and grubbing (aka brushing), road reconstruction, road widening, spot surfacing, dip construction, culvert installation and turnout construction. Located in Missoula & Granite Counties, Montana. PROCUREMENT OVERVIEW TYPE OF CONTRACT: Construction, Firm Fixed Priced (FFP), Single Award Contract TYPE OF CONSTRUCTION: Highway NAICS CODE: 237310, Highway, Street, and Bridge Construction MAGNITUDE: Between $250,000 and $500,000 RESTRICTIONS ON CONTACTS: Beginning upon release of the request for proposal (RFP) through contract award, contacting Government employees who may be associated with this project by participating offerors is inappropriate. Offerors participating in this RFP, including subcontractors and teammates, shall not contact Government employees during this period. All correspondence shall be submitted in writing only through the Contracting Officer listed below (telephonic inquiries will not be accepted): Bureau of Land Management Attn: Jorge Alvarez Email: jalvarez@blm.gov SITE VISIT: The Government strongly urges offerors to inspect the site to gain a better understanding of the work requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award. See Section L, Clause 52.236-27 Alternate I, Site Visit (Construction) Alternate I for more information. QUESTIONS DUE: 15 August 2025 at 1:00 pm, Mountain Time. Questions submitted after this date and time may not be answered. All questions must be submitted in writing via e-mail to Jorge Alvarez, jalvarez@blm.gov. See Section L, Paragraph L.9, Submittal of Questions for more information. PROPOSAL RESPONSE DATE: For dates when contractors are to submit their proposals, see block 13 of Standard Form 1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair). See Section L, Instructions, Conditions and Notices to Offerors, for a list of required documents. METHOD OF PROCUREMENT: This procurement is set-aside for Small Business Concerns and is a construction acquisition, pursuant to Federal Acquisition Regulations (FAR) Part 15, Part 19, and Part 36. Period of Performance: 09/18/2025 to 10/01/2026 An organized site visit has been scheduled for - Date: Tuesday, July 29th Time: 9:30 AM Mountain Time Meeting Place: Intersection of Road 4601 Rattler Gulch and I-90 (Drummond) Frontage Road (46.697755, -113.223902) on the south side of the frontage road. Take exit 154 from I-90 W 4 miles to Rattler Gulch Special Instructions: intersection. None Point of Contact for Site Visit: Kathie Marks Role/Title: Civil Engineer Phone: 460-329-3734 Email: kmarks@blm.gov Period of Performance: 09/18/2025 to 10/01/2026 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$500,000.00

Public - Federal

Site Work

14

9

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
69
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 18, 2025

Project location map

3255 Fort Missoula Rd, Missoula, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.