BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Demolition, site work, paving and new construction of a mixed-use development in Crested Butte, Colorado. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000384732 The work of this project will be in the Right of Way of Gothic Road and will require traffic control. This project will include removal of the current bridge and recreation path and improvement to the drainage for sustainable drainage and longevity of the pedestrian path. Project includes removal of the current bridge decking, structural components and handrail, excavation and realignment of approximately 46 feet of the drainage swale area, installation of an HDPE culvert including the installation of a debris grate and a flared-end structure with riprap. The recreation path will be reconfigured and reconstructed to a ten-foot-wide concrete path with three-foot gravel shoulders per the specifications and plans for the project. The current valley pan on the Gothic Road shoulder will remain in place and unchanged in the project. Relocation/adjustment of some dry utilities is anticipated. The work of this project shall be completed by September 15, 2025. Question Deadline 05/14/2025 at 12:00 PM MT Questions are submitted online No . Written questions are to submitted electronically to Mark Gayeski (SGM) at markg@sgm-inc.com.

Post-Bid

Sidewalks / Parking Lot

$1,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

11

13

10

3

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 16, 2025

Project location map

Anthracite Dr, Crested Butte, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.