BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 27, 2025

Site work and outdoor lighting for a civil project in Whitecourt, Alberta. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The scope of Work includes traffic signal work at the following intersections: Schedule A: RD01 - Roadwork at 52 Ave / 47 St Schedule B: RD02 - Roadwork at 49 Ave / 51 St Schedule C: TS01 - Traffic Signal Work at 52 Ave / 47 St Schedule D: TS02 - Traffic Signal Work at 49 Ave / 51 St Completion Dates For the Traffic Signal Upgrades components (Schedule C & D), the Completion Date is November 28, 2025 (Friday). For the Intersection Upgrades components (Schedule A & B), the Completion Date is August 21, 2026 (Friday). The scope of work for the Whitecourt Intersection / Signal Upgrades Project (hereafter referred to as the Project) shall include the following schedules and tasks: o Schedule A & B - Estimated Intersection Upgrades Quantities - Removal - Curb and Gutter 205 m - Removal - Sidewalk 105 m2 - Removal - Pavement Structure 195 m2 - Removal - Pavement Markings between 1,319 m and 1,600 m (Note) - Removal - Pavement Arrows between 14 and 19 Pavement Arrows (Note) - Removal - Concrete Swale (1.5m wide) 50 m - S&I - Curb & Gutter 195 m - S&I - Sidewalk 88 m2 - S&I - Curb Ramp Tooling 5 nos - S&I - Concrete Swale (750mm wide) 50 m - S&I - Pavement Structure between 1319 m2 and 2,380 m2 (Note) - S&I - Milling 2,145 m2 - S&I - Overlay between 282 tonnes and 430 tonnes (Note) - S&I - Signs 22 nos - S&I - Pavement Markings between 1,639 m and 1,774 m (Note) - S&I - Pavement Arrows between 25 and 30 Arrows (Note) - S&I - CB Grate 2 nos - Adjust Water Valve / MH Elevations 8 nos - Mobilization and Interim Traffic Control o Schedule C & D - Estimated Traffic Signal Upgrades Quantities - Removal - Existing JB 8 nos - Removal - TCC & PDC Base 4 nos - Removal - TCC and PDC Cabinets 4 nos - Salvage - all pole-mounted fixtures 8 poles - Salvage - cantilever poles (9m Arm) 2 nos - S&I - Conduits by Trenching 148 m - S&I - Conduits by Augering between 227 m and 301 m (Note) - S&I - JB 8 nos - S&I - Salvaged Pole Base (60x60) 2 nos - S&I - Ped Pole Base 2 nos - S&I - Salvaged Signal Pole (9m Arm) 2 nos - S&I - Streetlight Extension Davits 4 nos (1 is a double davit) - S&I - LED Luminaire 8 nos - S&I - 4m tall pedestal pole 2 nos - S&I - Cabinet Base 4 nos - Install - Owner-supplied TC Cabinet 2 nos - S&I - PD Cabinet 2 nos - S&I - signal heads 22 nos - S&I - ped signals 16 nos - S&I - MioVision cameras 2 sets - S&I - Pushbuttons 16 nos - S&I - Signs 14 nos - Signal Maintenance (spring, summer) 8 nos - Mobilization and Interim Traffic Control

Award

Roads / Highways

$529,536.00

Public - City

Outdoor Lighting, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
61
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

November 1, 2025

Project location map

Multiple Locations, Whitecourt, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.