BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2025 at 8:00 PM

Updated May 6, 2025

This is a service / maintenance or supply contract in Kenner, Louisiana. Contact the soliciting agency for additional information.

Scope of Work: The contractor shall perform the following tasks for each of the five (5) cooling towers located at the North Airport Towers: 1. Electrical Lockout/Tagout (LOTO): Safely disconnect and lock out electrical power supply to each cooling tower in accordance with OSHA standards and site safety protocols. 2. Water Isolation: Coordinate with Stationary Engineers to isolate water flow to each tower prior to cleaning operations. 3. Cooling Tower Cleaning: Clean each cooling tower using a combination of water pressure, approved chemical agents, and manual scrubbing. Cleaning shall include internal and external surfaces. 4. Use of Equipment: Utilize lift machinery and generator power as needed to access and service all tower components safely and efficiently. 5. Component Inspection and Cleaning: Clean and inspect the following components for each tower: Fill media Cold water sump Hot water sump Provide visual inspection reports for each component. At least 3 references from similar projects completed within the last 3 years.

Post-Bid

Transportation Terminals

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
4
Bidding Soon
405
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 4, 2025

Project location map

1 Terminal Dr, Kenner, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.