BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2025 at 8:00 PM

Updated June 8, 2025

Site work and paving for a sidewalk / parking lot in Cambridge, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Memorial Drive Phase III- Numerous parkway and parkland improvements along an approximate one-mile segment of the Memorial Drive Parkway from the Eliot Bridge to the Anderson Memorial Bridge at JFK Street. Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY-CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The scope of work includes, but is not necessarily limited to the following: installation of erosion and sediment control measures; establishment of temporary traffic controls; clearing and grubbing; excavation (including temporary earth support system, if selected by the Contractor); installation of a proposed shared use path and stabilized aggregate walking path (including amenities); mill & overlay and limited full depth reconstruction of the Memorial Drive parkway; installation of three (3) traffic signal locations and two (2) pedestrian signal locations; installation of a new, ornamental DCR street lighting system; modifications to the existing drainage system, including BMPs; new parkland trees and plantings; and other incidental work necessary to complete the proposed project. Written Questions shall be submitted to: Attn: Dan Driscoll, Project Manager Department of Conservation and Recreation Bureau of Transportation, Infrastructure and Construction 10 Park Plaza, Suite 6620 Boston, MA 02116 Email: dan.driscoll@mass.gov The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%.

Bid Results

Sidewalks / Parking Lot

$113,169,135.00

Public - State/Provincial

Paving, Site Work

184

11

3

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
537
Active Projects
199
Bidding Soon
4,142
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

August 4, 2025

Project location map

Memorial Dr, Cambridge, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.