BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2025 at 8:00 PM

Updated May 20, 2025

Renovation of a service station / car wash facility in Grand Prairie, Texas. Completed plans call for the renovation of a service station / car wash facility.

The City of Grand Prairie, Texas, is soliciting proposals for electric vehicle charging infrastructure repair and installation services through a competitive proposal process to work with the City on an as-needed basis. Q&A Deadline Questions Due Wednesday, May 7, 2025, at Noon Central Time 05/09/2025 at 2:00 PM CT ***Bid Event: Dial by your location +1 346 248 7799 US (Houston) +1 719 359 4580 US +1 253 205 0468 US +1 253 215 8782 US (Tacoma) +1 408 638 0968 US (San Jose) +1 669 444 9171 US +1 669 900 6833 US (San Jose) +1 301 715 8592 US (Washington DC) +1 305 224 1968 US +1 309 205 3325 US +1 312 626 6799 US (Chicago) +1 360 209 5623 US +1 386 347 5053 US +1 507 473 4847 US +1 564 217 2000 US +1 646 876 9923 US (New York) +1 646 931 3860 US +1 689 278 1000 US Meeting ID: 849 3569 1973 Passcode: 919724 Find your local number: https://gptx.zoom.us/u/kdSrvBRKOC Information, questions, or clarification concerning the intent of this RFP should be in writing and addressed to Venona McGee at vmcgee@gptx.org Qualifications are being accepted by the City of Grand Prairie for the provision of EV charging infrastructure on an as-needed basis. A qualified Provider shall provide turn-key EV charging solutions and MUST be capable of providing all aspects of installation and implementation including, but not limited to: concrete work, conduit installation, EV charger and pedestal installation, monitoring/billing software implementation, coordination with Oncor and City's designated representatives to ensure adequate power for each site, etc.: EV Charging Infrastructure including: Level 1 - 120 V (i.e., exterior building wall, parking lot light, stand-alone pedestal) o Single user (i.e., use of source by one user or one port) o Multi-user (i.e., use of source by more than one user, dual-port, multi-port) Level 2 - 240 V (i.e., exterior building wall, stand-alone pedestal o Single user (i.e., use of source by one user or one port) o Multi-user (i.e., use of source by more than one user, dual-port, multi-port) DC Fast Charging - 480+ V (i.e., stand-alone pedestal) o Single user (i.e., use of source by one user or one port) o Multi-user (i.e., use of source by more than one user, dual-port, multi-port) Mobile Device Application Software for activating charging: o For City of Grand Prairie employees, they are able to track the employee ID, vehicle unit ID, unique cost account, and usage. o For External customers, they are able to provide seamless billing for customers based on their usage.

Post-Bid

Service Station / Car Wash

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
146
Bidding Soon
3,810
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2025

June 18, 2025

Project location map

To Be Determined, Grand Prairie, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.