Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 13, 2025 at 8:00 PM
Updated May 14, 2025
Renovation of an educational facility in Spartanburg, South Carolina. Completed plans call for the renovation of a educational facility.
Remove and replace hardwood gym floor at Broome High School. Project Location: Broome High School Question Deadline 05/08/2025 at 5:00 PM ET Questions should be submitted in writing to: ewyatt@spartanburg3.org Note: No other District personnel shall be contacted regarding this solicitation. Spartanburg School District 3, hereafter referred to as the "District", is accepting proposals from qualified contractors for General Contracting in accordance with the requirements of this solicitation. The specifications included herein are to be considered as providing minimum desirable features. Any limitations, deviations, or broader features quoted should be designated in your proposal. Otherwise, companies and agents submitting proposals will be held to the specifications. Due care and diligence have been used in the preparation of this solicitation and the information contained herein is believed to be substantially correct, however, the responsibility for determining the full extent of the exposure and the verification of all information presented herein, shall rest solely upon the proposer. The District reserves the right to add or delete similar items/services in the contract documents as requirements change during the course of the contract. The District: Spartanburg School District 3 is composed of three (3) Elementary attendance areas, feeding two middle schools and one high school. The District consists of three (3) elementary schools, two (2) middle schools, one (1) high school, and one (1) career center. This RFP addresses only Broome High School. We serve approximately 3000 students and employ approximately 600 people. Spartanburg School District 3's general operating budget includes disbursements in excess of $24 million. Broome High School is located at 381 Cherry Hill Road, Spartanburg, SC 29307, it is in need of new gym flooring (approx. 12,500 sqft). The floor is maple hardwood. - All installation is to be performed in a professional manner by experienced flooring installers. - Contractor is to supply and install , flooring system , any cove base needed, paint lines as specified. - Flooring - Action Flooring Anchorflex flooring system wall to wall Approx. 12,500 sqft. Using 25/32x2 1/2MFMA maple flooring (or comparable) - Two coats of Oil Modified Polyurethane sealer - Paint - standard game line basketball court striping for quote. But additional striping for pickle ball courts and other graphics (logos) and markings will be required. - Apply Two coats of Oil Modified Polyurethane finish. - Install new Vent cove base and thresholds and Volleyball cover plates. - Contractor is responsible for removal of existing floor to the concrete slab & disposal of the existing hardwood floor off site. - Contractor is responsible for having telescoping bleachers moved and replaced by a Sheridan certified Bleacher contractor. - Contractor is responsible for proper clean up and disposal of trash and remnants. - Work to begin on July 14, 2025 and be completed by August 1, 2025.
Post-Bid
Educational
$90,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2025
July 14, 2025
381 Cherry Hill Rd, Spartanburg, SC
Related To This Project
Spartanburg, SC
Bid Date: Aug 15 2025
Spartanburg, SC
Bid Date: May 28 2025
Spartanburg, SC
Bid Date: May 20 2025
Spartanburg, SC
--
Spartanburg, SC
Bid Date: Jun 05 2025
Spartanburg, SC
Bid Date: May 21 2025
Spartanburg, SC
Bid Date: Jun 03 2025
Spartanburg, SC
Bid Date: Jun 12 2025
Spartanburg, SC
--
Spartanburg, SC
Bid Date: May 15 2025
Spartanburg, SC
Bid Date: May 29 2025
Spartanburg, SC
Bid Date: May 07 2025
Spartanburg, SC
Bid Date: Apr 29 2025
Spartanburg, SC
--
Spartanburg, SC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
