Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Site work and paving for a mixed-use development in Glendale, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
As of July 28, 2025 this project has not yet been awarded. A timeline for the award was not yet been established. Surface grinding and placement of ARHM; surface grinding and placement of ARHM over Asphalt Rubber Aggregate Membrane (ARAM); application of emulsion aggregate slurry over ARAM; selective removal/reconstruction of damaged curbs and gutters, sidewalks, driveways, cross gutters, alley aprons, and local depressions; modification and reconstruction of curb ramps to meet current ADA standards; adjustment of existing manholes and water meters to finished grade; installation of trash separators; removal and replacement of existing traffic striping and pavement markings; removal and replacement of sanitary sewer main line; sanitary sewer lining; and planting of new trees. The Engineer's Estimate for this project is in the range of $ 10,000,000 to $ 11,000,000 with Bond Requirements as follows Bid Bond: 10% of Bid Amount Labor and Materials Bond: 100% of Contract Amount Performance Bond:100% of Contract Amount *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 05/09/2025
Bid Results
Sidewalks / Parking Lot
$8,925,474.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2025
July 21, 2025
Multiple Locations, Glendale, CA
Related To This Project
Glendale, CA
Bid Date: Jun 03 2025
Glendale, CA
Bid Date: Jun 11 2025
Glendale, CA
Bid Date: May 13 2025
Glendale, CA
Bid Date: Feb 10 2026
Glendale, CA
Bid Date: Jun 05 2025
Glendale, CA
Bid Date: Jun 24 2025
Glendale, CA
--
Glendale, CA
Bid Date: May 21 2025
Glendale, CA
Bid Date: Aug 27 2025
Glendale, CA
Bid Date: Apr 22 2025
Glendale, CA
Bid Date: Jul 17 2019
Glendale, CA
Bid Date: Apr 07 2025
Glendale, CA
Bid Date: Apr 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
