BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

The deadline to ask questions is 5/21/2025 5:00 PM CST Scope The work consists of providing the necessary labor, materials, equipment, and supervision for the following work: 1. Pre-construction videotaping of the existing sanitary sewer system. 2. Installation of cured in place pipe as indicated by plans and specifications. 3. Manhole inspections as indicated by plan and specifications. 4. Post-construction videotaping of the rehabilitated sanitary sewer system. The project site is located west of State Highway 249 and north of Cypresswood Drive in Cypress Creek Utility District in northwest Harris County, Texas. Key map reference 369-B. The Work Shall Consist of Approximately: The furnishing of plant, labor, equipment and materials necessary for the repair of the existing sanitary sewer collection system, including all appurtenances as herein specified. Question Deadline 05/21/2025 at 5:00 PM CT Bidders desiring further information, interpretation of the contract information or contract documents and technical specifications and plans, must make requestsfor such information, in writing to the ENGINEER, 48 hours prior to the bid opening. Answers to all such requests will be given in writing to all bidders, in addendum form, and all addenda will be bound and made a part of the contract. Provides continuous sewer service to users of sewer systems while maintenance or construction operations are in progress, by diverting flow around construction locations. Maintain sewer flow to prevent backup or overflow onto streets, yards and unpaved areas or into buildings, adjacent ditches, storm sewers, and waterways. Do not divert sewage outside of sanitary sewer system. B. When pumps are operating, have an experienced operator on site to monitor operation, adjust pumps, make minor repairs to system, and report problems.

Bid Results

Water / Sewer

$592,015.00

Public - City

Site Work

12

14

5

10

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
205
Bidding Soon
3,467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

June 30, 2025

Project location map

To Be Determined, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.