BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2025 at 7:00 PM

Updated December 16, 2025

Demolition, site work, renovation and addition to a water / sewer project in Waxahachie, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

**PARENT PROJECT** *As of December 15, 2025, proposals for Sub bids for Phase 1 - Package 1 (Peak Flow Storage Tanks 2 & 3) were received on October 29, 2025. The bids received are currently under evaluation. Construction work for Phase 1/Package 1 is expected to start in early 2026. Trinity River Authority of Texas (Authority) invites the submittal of proposals ("Proposals") in response to this Request for Proposals (RFP) from all qualified firms to provide Construction Manager-At-Risk (CMAR) services for the Red Oak Creek Regional Wastewater System (ROCRWS) Expansion from 6.0 to 12.0 million gallons per day (MGD) (the "Project"). The expansion of the ROCRWS needs to be performed on an expedited basis to meet Texas Commission on Environmental Quality (TCEQ) requirements. This will necessitate completing the Project in two Phases: Phase I: Expansion from 6.0 MGD to 8.0 MGD to be complete, fully operational, and receiving and processing the specified flows in accordance with the facility's TCEQ discharge permit on or before March 31, 2027. Phase II: Expansion from 8.0 MGD to 12.0 MGD to be complete, fully operational, and receiving and processing the specified flows in accordance with the facility's TCEQ discharge permit on or before January 31, 2030. Bid Opening Notes: DIRECT ALL QUESTIONS REGARDING DISTRIBUTION OR DESIGN of Contract Documents for this Project through online. Only responses issued via Addenda are binding. Pre bid meeting notes: Attendees of the Pre-Proposal Site Visit must give 24-hours prior notice to: Tania Ho E-mail: hotm@trinityra.org Cell: 817-899-5964 Such notice may be provided via Call, Text, or E-Mail and must include attendees' name(s), company representing, purpose (Pre-Proposal Site Visit), and time of arrival. Enter the treatment plant by showing a valid ID to the security guard. Indicate to security guard desire to reach the Administration Building. The Administration Building is on the right after proceeding through the gate. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The deadline to ask questions is 5/23/2025 11:00 PM CDT Online - Q&A

Award

Water / Sewer

$230,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

788

11

8

7

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
382
Active Projects
190
Bidding Soon
3,861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

January 19, 2026

Project location map

908 Bells Chapel Rd, Waxahachie, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.