BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

This is a service / maintenance or supply contract in Maple Park, Illinois. Contact the soliciting agency for additional information.

This project requires 20% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 16, 2025, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase I engineering services are required to provide for all work associated with the preparation of preliminary engineering and environmental studies for the improvement of approximately five miles of IL 47 from I-90 to Plank Road in Kane County. Typically, the existing roadway cross section consists of one lane in each direction (undivided) with aggregate shoulders. The proposed improvement is anticipated to address geometric modifications through reconstruction to accommodate existing and projected year 2050 travel demands. Also anticipated to be considered is the need for a center median to accommodate turning vehicles with auxiliary lanes at intersections. Existing signals will be modernized, and other intersections will be investigated for signal warrants. Bridge inspections and reports will be required. A key planning tool will include a public involvement program based upon the principles of Context Sensitive Solutions. The scope will also include all related work necessary to complete a Combined Design Report and an accompanying Environmental Assessment. The following structures are included in this project: o S.N. 045-0336: at Eakin Cr o S.N. 045-0262: south of Reinking Rd o S.N. 045-2040: at Tyler Creek o S.N. 045-0226: near Thurnau Rd The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Environmental Reports (Environmental Assessment) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 02 - RFQ - IL 47 from Plank Road to I-90, Phase I Project

Conceptual

Bridges / Tunnels

$100,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
237
Bidding Soon
3,347
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

IL-47, Maple Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.