BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Renovation of a water / sewer project in Hamilton, New Jersey. Completed plans call for the renovation of a water / sewer project.

The proposed work for the project shall include, but is not limited to removal, disposal and replacement of granulated activated carbon (GAC) adsorber at four locations throughout the Township. Contract duration will be 60 Calendar Days. Other miscellaneous items of work shall be included, as directed by the Owner. 1.02 DESCRIPTION OF WORK The project shall consist of the following improvements: 1. Klockner Pump Station Description o Fiberglass Reinforced Plastic (FRP) tank Manufactured by DEI Systems, Inc. o Remove existing GAC adsorber SAI 46-KOH o Disposal of GAC according to all applicable regulations. o Clean tank for new GAC adsorber SAI 46-KOH (or equivalent) installation o Install GAC o GAC volume is 7'6" in diameter and 3'0" in elevation. o Put the system back into service 2. Deutzville Pump Station Description o FRP tank Manufactured by DEI Systems, Inc. o Remove existing GAC adsorber SAI 46-KOH o Disposal of GAC according to all applicable regulations. o Clean tank for new GAC adsorber SAI 46-KOH (or equivalent) installation o Install GAC o GAC volume is 2'4" in diameter and 1'6" in elevation. o Put the system back into service 3. Papps Village Pump Station Description o Removal and disposal of Polyethylene (PE) 55 gallon drum containing GAC o Disposal of GAC according to all applicable regulations. o Install new PE 55 gallon drum containing 180 pounds of virgin grade vapor phase carbon-4 mm pellets (or equivalent) o Existing PVC fittings will need to replaced/reinstalled to put the system back into service. 4. Highlands Pump Station Description o Removal and disposal of PE 55 gallon drum containing GAC o Disposal of GAC according to all applicable regulations. o Install new PE 55 gallon drum containing 180 pounds of virgin grade vapor phase carbon-4 mm pellets (or equivalent) o Existing PVC fittings will need to replaced/reinstalled to put the system back into service. Question Cuttoff Date & Time 5/30/2025 04:30:00 PM (ET)

Post-Bid

Water / Sewer

$680,000.00

Public - City

Renovation

5

5

2

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
880
Active Projects
338
Bidding Soon
7,162
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

Multiple Locations, Hamilton, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.