BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

This is a service / maintenance or supply contract in Forest Park, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 27% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 24, 2025, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to provide construction engineering for the subject project. Work included, but is not limited to, complete removal and replacement of the Laramie Avenue bridge, including widening of the deck to provide a U-turn lane, retaining wall construction to facilitate future I-290 improvements, curb and gutter replacement, sidewalk replacement, various drainage improvements, signing, pavement markings, bridge and underpass lighting, and traffic signal modernization at W. Harrison Street/Laramie Avenue, W. Flournoy Street/Laramie Avenue, and W. Lexington Street/Laramie Avenue, all incidental and collateral work necessary to complete the project. The following structures are included in this project: o S.N. 016-2064: existing S. Laramie Avenue over I-290 o S.N. 016-2015: proposed S. Laramie Avenue over I-290 o S.N. 016-W2545: new S. Laramie Avenue over I-290 o S.N. 016-W2546: new S. Laramie Avenue over I-290 The anticipated construction completion date is October 31, 2027. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 18 - RFQ - I-290 (Eisenhower Expwy) at Laramie Ave (Overhead), Phase III Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Bridges / Tunnels

$6,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
459
Active Projects
251
Bidding Soon
3,358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

Dwight D. Eisenhower Expy, Forest Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.