BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

Site work and paving for a sidewalk / parking lot in Jamestown, New York. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project Description: Persell Middle School - New Sidewalks Reference Number 0000385996 Question Deadline 05/07/2025 at 11:00 AM ET Questions are submitted online Yes If you have any questions or if you need any additional information, please contact me at the 716-483-7545. All work performed is to be paid at the State of New York Prevailing Rate (PRC# 2024004742). The City of Jamestown is not responsible for any errors by the contractor in classifications of work. A copy of the wage schedule is attached and is available for review at our office. Before payment is made, the Contractor shall submit a certified payroll form (DOL form PW-12) and a City of Jamestown Standard Application and Certificate for Payment form to this office This work shall begin after July 1, 2025 and must be completed by August 22, 2025 1. Add new sidewalks as outlined on drawing A-100. The sidewalk shall be no less than 4" thick and comply with all City of Jamestown requirements. This sidewalk contains 860SF. 2. Contractor shall provide a minimum of 4" of gravel under the new sidewalks. 3. Expansion joints shall be installed at each connection to the existing sidewalks. Saw cuts/tool joints shall be spaced apart no more than 5'. 4. All excavation, including the removal of the existing sidewalks, will be performed by the City of Jamestown Department of Public Works. 5. Finish of all sidewalks shall match City of Jamestown Department of Public Works Standard Specifications for Right-of Way Work, dated May 2011, or the most current edition. 6. This is a prevailing wage rate project. A prevailing wage rate schedule is available upon request. The work on this project must be guaranteed for one (1) year from the date of final completion and inspection. The guarantee period will have a value of five percent (5%) of the total project cost. This five percent (5%) retainage will be returned to the Contractor upon successful completion of the contract specifications and the expiration of the guarantee period.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
117
Bidding Soon
1,508
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

July 1, 2025

Project location map

375 Baker St, Jamestown, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.