BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work for a water / sewer project in Austin, Texas. Completed plans call for site work for a water / sewer project.

**As of August 7th, 2025, this project has not yet been awarded. The project is expected to be awarded on September 11th, 2025.** West 35th Street Water and Wastewater Pipeline Renewal The water system upgrades include replacement of approximately 1,500 linear feet of water line and 650 linear feet of wastewater. And the a storm drain improvement of over 600'. The Work consists of water, wastewater, and storm drain system renewals in the area bounded by W35th Street between Mopac (east) and Exposition Blvd (west). This project is part of Austin Water's and Watershed Protection Department's efforts to replace aging and deteriorated pipeline infrastructure. The water system upgrades include replacement of approximately 1,500 linear feet of water line and 650 linear feet of wastewater. Water line breaks are well documented in this area. The storm system upgrades include approximately 750 linear feet of 18-inch, 36-inch, and 42-inch storm drain with associated structures, and approximately 3,500 square yards of pavement replacement. African American 1.81% Hispanic American 5.39% Native/Asian American 0.31% WBE 1.43% All Bids shall be accompanied by an acceptable Bid guaranty in an amount of not less than five percent (5%) of the total Bid, as specified in Section 00100, Instructions to Bidders. Performance and payment bonds when required shall be executed on forms furnished by OWNER. Each bond shall be issued in an amount of one hundred percent (100%) of the Contract Amount by a solvent corporate surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. Minimum wage rates have been established and are specified in Section 00830, Wage Rates and Payroll Reporting. Contract Time is of the essence and all Work shall be substantially completed within two hundred seventy (270) Calendar Days after date specified in the Notice to Proceed, in accordance with the Bid Form, Section 00300. Final completion shall be achieved within sixty (60) Calendar Days after substantial completion. Liquidated damages are one thousand three hundred and sixty dollars ($1,360.00) per Calendar Day for failure to substantially complete the work and one thousand six hundred and ninety dollars ($1,690.00) per Calendar Day for failure to achieve final completion within sixty (60) Calendar Days after substantial completion, in accordance with the Bid Form, Section 00300. OWNER reserves the right to reject any or all Bids and to waive any minor informality in any Bid or solicitation procedure (a minor informality is one that does not affect the competitiveness of the Bid). Pre bid meeting notes: A non-mandatory Pre-Bid Conference will be held, via webinar and teleconference. Bidders may participate in the virtual pre-bid conference by clicking this link: Teams meeting or by calling (512) 831-7858 United States, Austin (Toll), Conference ID: 687 911 978# For those calling in, please send an email to ivan.quinones@austintexas.gov with the subject line CLMC1091, indicate in the body of the email your name, the firm you are representing, your contact information and whether you are a prime firm or subcontractor. Please send this by 5:00 pm on the day of the virtual pre-bid meeting. AW Project No.: 1570-026-02 CIP Project No.: 2231.332 Extended from 5/29/2025 at 2PM per Addendum 2.

Bid Results

Water / Sewer

$1,928,531.00

Public - City

Site Work

40

17

36

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

August 11, 2025

Project location map

W 35th St, Austin, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.