Published May 21, 2025 at 8:00 PM
Updated May 22, 2025
Site work for a civil project in Susanville, Oregon. Completed plans call for site work for a development.
Project Description: the Purpose of Oxbow Phase 6 is to Build Upon Previous Restoration Efforts Aimed at Mitigating Historic Gold Dredging Impacts. Phase 6 is Intended to Complete Adaptive Management Measures to Restore Natural Floodplain and River Function. The John Day Basin Office Has Partnered With the Bureau of Reclamation to Develop the Oxbow Habitat Enhancement Project. Phase 6 of the Project on the Middle Fork John Day River Proposes to Grade Floodplain, Install Floodplain and Large-woody Debris (Lwd) Structures, Construct Riffles, Vegetated Islands, Point Bars, and Bank Features, and Construct Side Channels and High Flow Swales. This Project is Intended to Improve Floodplain Connectivity With Groundwater, Riparian Vegetation Establishment, and Critical Rearing and Spawning Habitat for Chinook Salmon and Esa-listed Steelhead. This Project is Subject to Indian Preference, Bonding Requirements, Davis-bacon Wage Rates, and All Other Applicable Federal, State, and Tribal Rules and Regulations. The Oxbow Phase 6 Habitat Enhancement Project Involves in-stream Work and Will Be Required to Adhere to the in-water Work Window of July 15 - August 15. Due to the Commonly Wet Conditions of This Work Area, the Contractor Could Start Work as Early as Mid-june, but Will Be Expected to Start Work by July 1, 2025 and Be Finished by Late-september. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Conservation and Development
$1,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2025
July 1, 2025
Middle Frk Rd, Susanville, OR
Related To This Project
Portland, OR
Bid Date: May 22 2025
Beaverton, OR
--
Beaverton, OR
--
Corvallis, OR
--
Corvallis, OR
--
Corvallis, OR
--
Corvallis, OR
--
Forest Grove, OR
Bid Date: Jun 26 2025
Oregon City, OR
--
Hillsboro, OR
--
Molalla, OR
--
Durham, OR
--
Three Lynx, OR
--
Portland, OR
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.