BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work and paving for a road / highway in Saucier, Mississippi. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Overlay approximately 7 miles of SR 15 from the intersection SR 67 North, known as Federal Aid Project No. STP-0022-01(095) / 109815301 in Harrison County. Project Completion : Flexible SM No. CSTP0022010951 Value Estimate Range - $1,000,000 - $5,000,000 For Federal Aid Projects the attention of bidders is directed to the contract provisions governing selection and employment of labor contained in the bid proposal. Minimum wage rates for Federal Aid Projects have been predetermined by the Secretary of Labor and are subject to Public Law 87-581, Work Hours Act of 1962, as set forth in the contract provisions. Unless otherwise set out in the bid proposal, all other projects are subject to the predetermined minimum wage rate set by the U.S. Department of Labor under the Fair Labor Standards Act. When a DBE goal is contained in the contract, the award will be contingent upon the Contractor satisfying the DBE requirements. Bid bond, signed or countersigned by a Mississippi Resident Agent or qualified non-resident agent, with Power of Attorney attached or on file with the Contract Administration Engineer of the Department, a Cashier's Check or Certified Check for five (5%) percent of bid, payable to State of Mississippi, must accompany each proposal. The attention of bidders is directed to the provisions of Subsection 102.07 pertaining to irregular proposals and rejection of bids. MSDOT - Call 05 - Overlay - SR 15 The completion of work to be performed by the Contractor for this project will not be a specified date but shall be when all allowable working days are assessed, or any extension thereto as provided in Subsection 108.06. It is anticipated that the Notice of Award will be issued no later than June 10, 2025. The Contractor shall request a Notice to Proceed/Beginning of Contract Time date between the dates of the July 10, 2025 and September 11, 2025. Should the Contractor request a Notice to Proceed earlier than July 10, 2025 and it is agreeable with the Department for an early Notice to Proceed, the requested date will become the new Notice to Proceed and Beginning of Contract Time date. Should the Contractor not request a Notice to Proceed by September 11, 2025, the date for the Notice to Proceed and Beginning of Contract Time will be September 11, 2025. All requests for an early Notice to Proceed shall be sent to the Project Engineer who will forward it to the Contract Administration Division. 32 Working Days have been allowed for the completion of work on this project. Addendum No. 1 - 5/22/2025: Work on the project shall consist of leveling and overlaying State Route 15 beginning at SR 67 then going north approximately 7 miles. QA - The BOP is at the 67 bridge excluding the ramps. The EOP is 1.6 miles North of White Planes rd. (N30.577493, W88.932155). There is a pavement change at this location. The roundabout gets milled and will be paved back with 1.5 of 9.5-mm ST. The limits on Lamey Bridge Rd. will be the pavement change at the end of the gore area on the east and west ends. See Addendum 1 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$2,452,602.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
85
Bidding Soon
823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

July 10, 2025

Project location map

MS-15, Saucier, MS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.