Renovation of a water / sewer project in Saint Joseph, Missouri. Completed plans call for the renovation of a water / sewer project.

St. Joseph, MO Water Protection Facility (WPF) Domestic Blower Replacement Construction Manager at Risk Services The Project scope includes but is not limited to the following: o Replacement of Domestic Aeration Blowers. Final number of new blowers to be determined o Upgrades to Blower Electrical Systems (e.g., wiring, conduit, MCC's, switchgear, and VFDs) Dependent on design and site conditions scope may include: o Enhancements to Instrumentation and Control (I&C) Equipment o Architectural Improvements, including installation of overhead doors and roof piping penetrations o Mechanical/HVAC Upgrades to Blower Building As part of HDR scope of services, HDR will be evaluating up to three (3) blower alternatives. The final selection on blower type will be communicated to the CMAR contractors as part of selection. 2.3 Project Budget and Funding This Project is being financed via the City and the United States Army Corps of Engineers (USACE). The USACE funding requirements are still being finalized. The total Project budget, including construction, engineering, and CMAR, is $7,500,000. 2.4 Project Permits and Approvals Table 1 identifies anticipated permits and approvals required for the Project as well as the respective responsibilities of the Owner and CMAR in obtaining required permits and approvals. Final permitting requirements will be determined within the final BODR; however, an MDNR construction permit is not anticipated with this project nor are any City of St Joeseph, MO, permits. 2.5 Project Schedule This preliminary schedule seeks to provide adequate time for the procurement of material, equipment, and specialized subcontractors necessary for the replacement of the domestic blowers and associated system upgrades. Respondents are requested to provide feedback on the proposed schedule. Deadline for questions 05/23/2025 Written requests for information should be directed to HDR and City be copied: Derek Patrick, PE HDR Engineering, Inc, Derek.Patrick@hdrinc.com Edward Leaverton, City of St Joseph, MO, eleaverton@stjosephmo.gov

Post-Bid

Water / Sewer

$7,500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
0
Bidding Soon
874
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

October 2, 2025

Project location map

To Be Determined, Saint Joseph, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.