BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2025 at 8:00 PM

Updated June 17, 2025

Site work for a water / sewer project in Crossville, Tennessee. Completed plans call for site work for a water / sewer project.

Master Meter Project. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The Owner reserves the right to waive any informalities or to reject any or all bids. SCOPE OF WORK The master meter, water lines, and appurtenances required on this Contract shall be furnished in compliance with the Contract Specifications and the Contract Drawings. The contractor shall acquire the telemetry equipment from MICROCOMM as per Contract Documents. The contractor shall hire Brann and Whittemore for telemetry equipment installation as per Contract Documents. Work to be performed under the Lump Sum Contract for the items described subsequently herein shall include for each item all excavation (including rock excavation, if any) the removal of existing pavements, curb and gutter, sidewalks, driveways, brush and timber, structures and piping to be relocated or abandoned; also sheeting, diking, well pointing, bailing, dewatering; the furnishing and placing of bulkheads, the restoration of any utilities, parkways, trees, shrubbery, culverts, fences and any other items not covered under subsequent items disturbed by construction operations; backfilling and removal of excess excavated

Award

Water / Sewer

$168,798.00

Public - City

Site Work

6

9

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
39
Bidding Soon
922
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

June 19, 2025

Project location map

2954 Hwy 70 N, Crossville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.