BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 31, 2025

Site work and paving for a mixed-use development in Broken Arrow, Oklahoma. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.

a. This project consists of a conceptual design study for improvements to the intersection of N. 20th Street and E. Hillside Drive. The consultant shall develop a conceptual design study which includes design plans and cost estimates for both a roundabout and a signalized intersection at the project location. As part of the conceptual study, the consultant shall also provide a recommendation for an optimal solution to the city. Factors to be included in the conceptual design study shall include but are not limited to: traffic analyses, geometric design, stormwater design, utility relocation and coordination, right-of-way requirements and acquisition. A traffic study, previously performed for the city which analyzed both a roundabout and signalized intersection, is included for informational purposes. b. This project consists of improvements to the existing two-lane entryway (S. 138th E. Avenue) to the park, along with parking lot expansion for Elam Park. Plans shall be developed to widen the entryway from two lanes to four lanes with raised medians, consistent with the Elam Park Master Plan, from W. Florence Street to approximately the far north school access from S. 138th E. Avenue. The remaining entryway does not require expansion at this time and will not be included in this project. The project shall also include developing plans for expansion of the existing Elam Park parking lot to double the current number of parking spaces. All design work will need to take into consideration future growth of Elam Park in accordance with the Elam Park Master Plan, along with being Questions concerning the RFQ may be addressed to the Project Manager, Maddy Scheel, 918-259-7000, extension 7633.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Site Work

4

3

4

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
82
Bidding Soon
823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

June 30, 2025

Project location map

Multiple Locations, Broken Arrow, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.