Site work, new construction and renovation of a mixed-use development in Coffeyville, Kansas. Completed plans call for the construction of a communication facility; for the renovation of a communication facility; and for site work for a communication facility.

Description: Currently, two transformers are providing power to the Messer and CVR manufacturing plants. These transformers are inadequate to meet the facilities power demands, necessitating a transformer upgrade. The upgrade will involve the following: Expanding and reconfiguring the substation yard Replacing existing transformers with two 125 MVA transformers (longest lead item, arriving Q3 2026) Installing a MaxiAmp trench system Installing new strain and rigid bus systems Erecting multiple steel structures Installing 15kV Circuit Breakers, 15kV GOABs, and 138kV GOABs Constructing a new control house Installing a new ground grid, conduit, control cable, power cable, and communication cable Performing a 138kV line termination Installing additional components to complete construction The above items include shipping and handling to site, and other items incidental work indicated on the plans and specifications. The project will be constructed in two phases. Phase One is planned to occur in Q4 2025, while Phase Two is planned for 2027/2028. Some of the construction for this project will be limited to planned outage windows in October of 2025 and October of 2028. The Proposal consist of furnishing and delivery of the specified equipment (referred to as Goods) to the point of destination, including performance of special services at the site in conjunction with installation of the Goods by others as part of the Buyers construction program, all in accordance with the Proposal Documents. Pre-Bid Meeting Info: There is no pre-bid conference for this project. Question Deadline 05/14/2025

Post-Bid

Power Plant

$450,000.00

Public - City

New Construction, Renovation, Site Work

115

9

28

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
57
Bidding Soon
813
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

June 27, 2025

Project location map

To Be Determined, Coffeyville, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.