BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2025 at 8:00 PM

Updated July 8, 2025

Renovation of a municipal facility in Orange, Texas. Completed plans call for the renovation of a municipal facility.

LCM CISD reserves the right to reject any and all proposals. Questions concerning the bid should be addressed to Phillip Matthews or Stuart Moorman at 409-670-4612. Any additional questions can be submitted through the: Little Cypress Mauriceville CISD Maintenance Department 8901 M.L. King Dr. Orange Texas 77632 409-670-4612 Vendors submitting a proposal will be required to submit each ofthe following: o The proposal in any format desired by the vendor. The proposal must include an itemized breakdown of all costs as requested, and a projected time schedule for start and completion ofthe project once awarded. o Any and all options may be submitted and priced separately. o Job references for similar projects. o Proof ofworkers' compensation insurance as described below. o Proof ofliability insurance as described below. o Completed Specification Compliance form (included in packet). o Signed LCM CISD School Policies and Rules (included in packet). o Completed Felony Conviction Notification (included in packet). o Completed House Bill 89 Verification (included in packet). o Signed Terms and Conditions (included in packet). o Bid Summary Sheet attached as cover page for proposal (included in packet). o A site visit must be scheduled with the maintenance department. o All contractors must sign in daily at the maintenance office before going to any campus and must sign out when complete unless other arrangements are approved. o All contractors must wear a badge provided by the district. o All construction must be performed to current industry standards. o The dimensions provided are approximate and rounded to the foot. Dimensions could suffice for bidding purposes, but all contractors are responsible for acquiring their own final measurements. o All colors and material must meet district approval. o All construction and material must be consistent with the International Building Code (IBC) o Any demolition and excess construction materials must be disposed ofby the bidder. LC Intermediate 2300 Allie Payne Orange TX 77632 Provide material and construction for the addition offour interior offices according to the diagram provided in this pack. The new walls are identified as interior. The perimeter walls exist. o 2x4 wood stud walls for a height of 10' o Stud wall to be insulated with appropriate fiberglass insulation which will primarily be for sound dampening. o 5/8 fire rated, asbestos free drywall, taped and floated with a very light texture, either blown or rolled. Must be preapproved by the district. o One coat of drywall primer and two coats ifinterior paint for new walls and one coat ofpaint or existing walls. Primer and paint to be provided by the district. o A total ofseven 3x7 doors andjambs with wedge casing will need to be installed as shown on the diagram. Door units and casing provided by the district. o Door vision panel framework and glass to be installed in each door. Vison frames and glass to be provided by the district. o Electrical rough-in may need to be installed into the new walls. All electrical material and makeup will be provided by the district. o One door opening will need to be cut into an existing drywall wall, and a new door and jamb unit must be installed. Door provided by the district. Provide material and construction to add two office spaces within the work/copier room according to the diagram provided. o 2x4 wood stud walls for a height of 9'. The wall is to butt up cleaning to the suspended ceiling tile and grid. o Stud wall to be insulated with appropriate fiberglass insulation which will primarily be for sound dampening. o 5/8 fire rated, asbestos free drywall, taped and floated with a very light texture, either blown or rolled. Must be preapproved by the district. o The existing cabinetry within the path ofthe new walls will need to be cleanly cut out so the wall can be attached to the existing walls. o One coat ofdrywall primer and two coats ifinterior paint for new walls. Primer and paint material to be provided by the district. o A total oftwo 3x7 doors and jambs with wedge casing will need to be installed as shown on the diagram. Door units and casing provided by the district. o Door vision panel framework and glass to be installed in each door. Vison frames and glass to be provided by the district. o Electrical rough-in may need to be installed into the new walls. All electrical material and makeup will be provided by the district. LC Elementary 5723 Meeks Drive Orange TX 77632 Provide material and construction oftwo walls of a new restroom according to the diagram provided. o 2x4 wood stud walls, each 8' long for a height of 10' o Stud wall to be insulated with appropriate fiberglass insulation which will primarily be for sound dampening. o 5/8 fire rated, asbestos free drywall, taped and floated with a very light texture, either blown or rolled. Must be preapproved by the district. o One coat ofdrywall primer and two coats ifinterior paint for new walls. Primer and paint material to be provided by the district. o A total of one 3x7 door and jamb with wedge casing will need to be installed as shown on the diagram. Door units and casing provided by the district. o The existing cabinetry within the footprint ofthe restroom will need to be removed and salvaged. Must be removed as reusable units. o Patch any drywall damaged from the cabinetry removal. o Remove and replace the existing ceiling tile and grid for the wall construction. o Electrical rough-in may need to be installed into the new walls. All electrical material and makeup will be provided by the district. MV Elementary 20040 EM 1130 Orange TX 77632 Provide material and construction ofone wall according to the diagram provided. o 2x4 wood stud walls for an approximate height of 10'. The wall is to butt up cleaning to the suspended ceiling tile and grid, but proper reinforcement support above the ceiling o Stud wall to be insulated with appropriate fiberglass insulation which will primarily be for sound dampening. o 5/8 fire rated, asbestos free drywall, taped and floated with a very light texture, either blown or rolled. Must be preapproved by the district. o One coat ofdrywall primer and two coats ifinterior paint for new walls. Primer and paint material to be provided by the district. ' o Electrical rough-in may need to be installed into the new walls. All electrical material and makeup will be provided by the district.Any equivalent systems or materials can be offered and could be considered. o Any other option that may improve the performance ofthe final product or be of an economic advantage to the district. o Options are to be priced separately ifapplicable.

Post-Bid

Municipal

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
48
Bidding Soon
687
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 3, 2025

Project location map

Multiple Locations, Orange, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.