BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated October 25, 2025

Renovation of a water / sewer project in Waterloo, Ontario. Completed plans call for the renovation of a water / sewer project.

Electrical Contractor Prequalification. Generally, without limiting the scope of the project, the work covered by this pre-qualification covers the following: - Installation, testing, and commissioning support for temporary controls if required to support the site cut-over strategy - Removal and disposal of existing equipment, including control panels, control stations, and junction boxes - Receiving, delivery and set-up of materials on-site as necessary - General Site Safety - Installation of new electrical equipment, including control panels, control stations, and junction boxes - Installation/replacement of field device wiring as required - Supply and install of cast-in-place (CIP) concrete housekeeping pads as needed for control panel floor mounting - Supply / provision and installation / modification of all required conduit, raceway, cable tray, cables, wires, and junction boxes. - Termination and labeling of all cabling and wiring - Installation of new Distribution Panel breakers - Replace Rockwell ControlLogix and CompactLogix processors with newer versions (1756-L83 and 5069-L330ER) - Replace existing discontinued Rockwell 1756 6-point analog cards with the newer 1756 8-point analog cards - Replace power supplies and work area outlets - Replace obsolete equipment - Installation of new Horizontal cabling between PLC panels, and between PLC panels and network enclosures including supply of all necessary cabling in conformance with the latest Region of Waterloo standards - Network cable testing and validation including the supply of detailed testing reports - Retagging of Instruments and devices to conform to the current naming standard - Test and confirm accuracy of all new or modified wiring back to the termination point - Obtaining of necessary permits and inspections - Support for Commissioning and Site Acceptance testing - Decommissioning and removal of any temporary works required to support the cut over strategy. - In some cases, minor mechanical works (e.g. piping or valve replacements, temporary piping for commissioning testing) may be included in the scope of work proponents should be prepared to complete this work either with a mechanical sub-contractor, or own forces. Documents can be obtained at: https://regionofwaterloo.bidsandtenders.ca Estimated Project Value: The work will be divided into 4 contracts of up to $200,000 each. Total contracts value is estimated to up to $800,000. Estimated Construction Schedule: Time for Completion: 3 years Award of Contract: at various stages throughout the 3 year project Start of Implementation: November 2025 Completion of Implementation: November 2027

Post-Bid

Water / Sewer

$800,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
209
Bidding Soon
4,233
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2025

November 3, 2025

Project location map

190 University Ave, Waterloo, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.