Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2025 at 8:00 PM

Updated September 25, 2025

Site work and renovation of a mixed-use development in Holland, Minnesota. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

The Project includes the following Work: Installation of water tower mixer and recirculation pump, interior and exterior structure modifications, removing and replacing interior and exterior coatings, and electrical and controls. Est. Completion Date: Dec. 8, 2025 ** doc info : Bidders who return full sets of the Bidding Documents in good condition within 10 days after receipt of Bids will receive a full refund. Non-Bidders, and Bidders who obtain more than one set of the Bidding Documents, will receive a refund of $60.00 for documents returned in good condition within the time limit indicated above. Make deposit checks for Bidding Documents payable to Bollig Engineering. Question Deadline 05/20/2025 DESCRIPTION OF WORK A. The project will include, but not be limited to the complete construction of the following items: 1. Installation of a new water tower mixer. 2. Installation of new recirculation pump. 3. Interior and exterior structure modifications. 4. Remove and replace interior and exterior coatings. 5. Disinfection 6. Excavation and Removal of existing watermain 7. Installation of new watermain, fire hydrant, gate valve, and connection to the existing system

Bid Results

Water / Sewer

$692,661.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

22

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
22
Bidding Soon
370
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2025

June 26, 2025

Project location map

Main Street and Carter Avenue, Holland, MN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed