BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and paving for a road / highway in Georgetown, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

construction services for: Village of Georgetown 2025 Pavement Rehabilitation Program. Question Deadline 05/23/2025 Contact information and submittal procedures for such questions are as follows: A. All questions shall be directed to the Engineer, Kyle Messaros. 614-901-2235 or kmessaros@structurepoint.com The Project includes the following Work: Douglas Circle: 3" milling and resurfacing of the entire pavement limits of Douglas Circle. The 3" asphalt pavement shall be placed in two (2) 1.5" lifts. No pavement marking replacement work is included in this section of roadway. Total work length is approximately 0.39 mile. Banting Drive: 1 1/2 " milling and resurfacing of Banting Drive from the eastern edge of traveled way of Home Street to the eastern terminus of Banting Drive. No pavement marking replacement work is included in this section of roadway. Total work length is approximately 0.28 mile. Harmony Lane: 2" milling and resurfacing of Harmony Lane from the southern edge of traveled way of Banting Drive to the southern terminus of Harmony Lane, including the cul-de-sac. No pavement marking replacement work is included in this section of roadway. Total work length is approximately 0.16 mile. Lakeview Acres Drive: 2" milling and resurfacing of Lakeview Acres Drive from the eastern edge of traveled way of Free Soil Road to the western edge of traveled way of S. Main Street. No pavement marking replacement work is included in this section of roadway. Total work length is approximately 0.37 mile. Kellie Terrace: The full depth removal and replacement of the existing pavement of Kellie Terrace from the southern edge of traveled way of Lakeview Acres Drive to the southern terminus of Kellie Terrace. No pavement marking replacement work is included in this section of roadway. Total work length is approximately 0.10 mile. E. North Street (Section 1): 1 1/2 " milling and resurfacing of E. North Street from the eastern edge of traveled way of N. Main Street to the western edge of traveled way of E. Grant Avenue. The eastern crosswalk line that lies on the pavement joint and stop line on the east leg of the N. Main Street and E. North Street shall be replaced with Item 644 pavement markings. Total work length is approximately 0.40 mile. E. North Street (Section 2): 3" milling and resurfacing of E. North Street from the eastern edge of traveled way of E. Grant Avenue to the parking lot of Kathryn Hanlon Park. Resurfacing of the parking lot is not included in the scope of work. The 3" asphalt pavement shall be placed in two (2) 1.5" lifts. No pavement marking replacement work is included in this section of roadway. Total work length is approximately 0.29 mile. **Please refer BT for bid tabulation*

Bid Results

Roads / Highways

$520,185.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
105
Bidding Soon
2,231
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

June 30, 2025

Project location map

Multiple Locations, Georgetown, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.