Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 23, 2025 at 8:00 PM
Updated May 24, 2025
Renovation of a municipal facility in Ballston Spa, New York. Completed plans call for the renovation of a municipal facility.
Reference Number 0000385981 Skylight Panel Replacement / DPW Building 4, 3654 Galway Road, Ballston Spa, New York . Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Question Deadline 05/19/2025 All questions and comments related to this project are to be directed to Mr. Abreu in writing via email. Technical questions will be accepted up to three business days prior to the bid due date. Questions are submitted online No Saratoga County, through its Central Services Department, reserves the right to reject parts of any or all bids. All work shall be subject to equal opportunity in employment, State wage rates and all other requirements in accordance with applicable law. Provide construction services for the replacement of polycarbonate skylight panels and replacement with CDX plywood, underlayment, and metal roofing to match existing adjacent metal panels. The work shall include all labor, equipment, and materials necessary for a complete, weather-tight, finished product. At a minimum work shall include the following: o Remove existing polycarbonate panels along each side of Building 4 Salt Storage Building. o Install new 5/8" CDX plywood to match existing to secure to existing 2x6 purlins. Provide blocking on purlins as needed to support plywood. o Install 30# titanium underlayment moisture barrier over plywood. o Install new factory formed 29 gage corrugated metal roofing panels to underlying plywood. Panel color to be selected by the County. o Provide necessary new metal trims to promote proper shedding of water as required. Copies of the as-built drawings and dimensions for this building are provided in Attachment A - Building Drawings. Detail 8 - Skylight Installation on Drawing A-7 provides cross-sectional view of this installation. The intent of this specification is to outline a "turnkey" project. Bids are to include all labor, equipment and materials necessary for complete installation as described. Items which may have been unintentionally omitted but which are required for a complete project are the responsibility of the Contractor.
Post-Bid
Municipal
$46,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2025
June 23, 2025
3654 Galway Rd, Ballston Spa, NY
Related To This Project
Ballston Spa, NY
Bid Date: May 13 2025
Ballston Spa, NY
Bid Date: Jul 29 2025
Ballston Spa, NY
Bid Date: Jun 17 2025
Ballston Spa, NY
Bid Date: Nov 19 2025
Ballston Spa, NY
Bid Date: Jun 23 2025
Ballston Spa, NY
Bid Date: Jun 24 2025
Ballston Spa, NY
--
Ballston Spa, NY
--
Ballston Spa, NY
Bid Date: May 14 2025
Ballston Spa, NY
Bid Date: May 29 2025
Ballston Spa, NY
Bid Date: May 06 2025
Ballston Spa, NY
Bid Date: Jun 13 2025
Ballston Spa, NY
Bid Date: Apr 30 2025
Ballston Spa, NY
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed