Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 17, 2025 at 8:00 PM
Updated June 26, 2025
Site work and paving for a mixed-use development in Miami, Florida. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Tamiami Park - Miracle League Field Renovation Scope of Work: CONTRACTOR shall review all documents, specifications, plans and scope of work provided by Miami-Dade County Park & Recreation Construction Division for work to be completed. Furnish all labor, equipment and materials required to: Replace the existing rubberized poured in place surfacing of the Miracle League Baseball Field located in Tamiami Park. This is a complete replacement of the entire field, which includes the surfacing found inside both dugouts, infield, outfield and foul ball territories. Also, included in this project is milling, asphalt overlaying, and restriping of the ADA access route and parking & drop off area. 1.1) Sketch #1 shows the location of the Miracle League Field inside Tamiami Park (11201 SW 24 Street, Miami, FL 33165). 1.2) Sketch #2 shows the existing Miracle League Field and the dugouts. 1.3) Contractor shall carefully survey the existing Miracle League Field including the exact location of the bases, foul lines, pitcher's mound, batter and catcher boxes, batters warmup circles, coach's boxes and the Marlin's and Miracle League's logos. Also survey the outlines of the boundaries between the green surfacing and the brown surfacing. 1.4) The intent of this project is to replace all of the existing rubberized surfacing with new rubberized surfacing in the exact location of the existing surfacing. 1.5) The contractor shall demo and properly dispose of the existing rubberized surfacing from the entire field including the two dugout areas. The contractor is responsible to make their own measurements of the existing depth of the rubberized surfacing as the depth varies on average between 3/4 inches to 1 1/4 inches. The contractor shall visit the site during the Prebid field meeting to take all of their measurements including the dimensions of the infield, outfield and dugouts. 1.6) Under the existing rubberized surfacing is an Asphalt Concrete pavement. 1.7) The contractor shall use only light weight equipment (bobcat, etc) on the asphalt concrete pavement. 1.8) The asphalt concrete pavement shall be cleaned of all debris before applying the new rubberized surfacing. The AC pavement shall be cleaned with a rotary power broom to ensure the existing rubberized surfacing is removed. 1.9) The AC pavement shall be power washed with a pressure washer to ensure that the AC pavement is clean of all dirt/debris. 1.10) The AC pavement needs to be completely dry before applying the new rubberized surfacing 1.11) Once the AC pavement is fully exposed, the contractor is required to notify PROS so that an inspection of the AC pavement can be conducted together. At this point the Contractor will repair any cracks/sinkholes (if any). Payment for repairs to the AC pavement will be negotiated with the contractor and use the Contingency Allowance of this contract; therefore, these repairs to the AC pavement will not be monetarily part of the base bid of this project. Cracks that are 1/4 inch wide or less can be addressed using asphalt crack filler, while larger cracks and holes will be widened by saw cutting a trench, recompacting the base and installing new AC pavement. 1.12) Also once the AC pavement is fully exposed and cracks addressed, the contractor shall survey the AC pavement (topographical survey with 10-foot contour lines) to identify any depressions in the pavement. 1.13) Depressions (if any) will be addressed by the contractor using self-leveling concrete. While the cost of the survey will be included in the base bid, the self-leveling concrete repairs will be negotiated and paid using the Contingency Allowance of this contract. Therefore the self-leveling concrete repairs will not be monetarily part of the base bid of this project. 1.14) After all cracks and depressions have been addressed on the bare AC pavement and that there is no loose material on the AC pavement, the contractor can proceed to install the new rubberized surfacing. 1.15) The contract shall use EverTop Primer and EverTop Surfacing (Or an approved equal). The contractor is to follow the recommended manufacturers instructions in executing the application of their product. Please note that EverTop requires approximately a nominal thickness of 1/2 inch of rubberized surfacing, with an acceptable minimum depth of 3/8 inch and maximum depth of 5/8 inch. 1.16) Included in the construction documents is the specifications for EverTop products for The Miracle League Fields. These specifications also show the requirements of the material design criteria, material storage, project site conditions, warranty, and installation execution. The contractor shall follow all the recommended manufacturers instructions in executing the application of their product. 1.17) The colors of the rubberized surfacing show follow the standard Miracle League National Recommendations as depicted in the EverTop specifications. 1.18) The contractor shall use an aliphatic binder system which is more Ultraviolet stable and more resistant to yellowing. 1.19) There are two logos that will need to be reproduced into the new rubberized surfacing material. Sketch #3 shows the existing two logos, one of which is The Miracle League standard logo, and the other is the Miami Marlins logo. The contractor is to match the existing logos in size, color and location. 1.20) The contractor shall supply the County with a 7-year warranty for the aliphatic binder system starting from the date of substantial completion of the project. 1.21) Near the end of the project, the contractor shall pressure wash the entire PC concrete area surrounding the Miracle League Field, including the bleachers, under the bleachers and dugouts. 1.22) Restripe, using thermoplastic, the four ADA wheelchair access decals on the existing PC concrete that surrounds the Miracle League Field. These four decals are found on each side of the two existing aluminum bleachers. The contractor is to clean the existing decal area of loos material before restriping in thermoplastic. 1.23) Repair the concrete pad adjacent to the drinking water fountain. The contractor is to remove the top soil, compact the base and form up the triangular shaped missing pad. The contractor shall drill 3-inches into the sides of the existing missing concrete pad in order to epoxy in four (4) rebar (No. 4) dowels approximately 6-inches long prior to pouring the concrete. The concrete thickness should match the existing concrete which is estimated to be 4-inches thick. Concrete shall be 3000 psi with a broom finish. Sketch #4 shows the concrete repair area. 1.24) Add two asphalt walkways as shown in Sketch #5. The first walkway (Item A) leads from the parking lot ADA drop off point located north of the Miracle League Field and runs to the NE corner of the PC concrete pad that surrounds the Miracle League Field. The asphalt walkpath (Item A) shall be 8-feet wide by approximately 240 feet and 1-inch thick. The second walkway/vehicle path (Item B) shall extend the existing vehicle path that leads down from the swimming pool and travels west to the NE corner of the PC concrete pad that surrounds the Miracle League Field. The asphalt vehicle path shall match the existing width which is approximately 10 feet wide by 35 feet and 1 inch thick. For both Item A and Item B, the contractor shall remove the sod and topsoil. Install clean Lime rock base and well compact the base to finish grade prior to installation of the AC concrete. The finished elevations of the asphalt walkways shall be 1-inch higher than the existing sod. Install soil and sod in areas where the construction disturbed the existing area (for example along each side of the new walkway). 1.25) Sketch #5 also shows five (5) existing broken/cracked asphalt concrete areas that are to be cut, demoed and patched. The five (5) areas are labeled as Items C, D, E, F, and H. For each area, saw cut, remove existing asphalt/debris, add lime rock if needed, and compact very well. Then install asphalt (hot mix) at a minimum of 1 inch thick so as to be flush to any adjacent existing asphalt. Also shown on Sketch #5 is Item G, which is a direct asphalt overlay on top of the existing asphalt. Approximate square footages of the areas are listed on Sketch #5. 1.26) Sketch #5 (Item I) shows the approximate location of the fence opening that the contractor shall create to allow access onto the proposed new asphalt walkway. Sketch #5.1 shows removal of three 16-foot long 2x6 wood rails (Item A) and one 8-foot long 2x6 wood rail (Item B). Contractor shall install two new wood 6x6 posts, matching existing size and shape, on each side of the proposed new asphalt walkway (Item C). Contractor shall remove two existing wooden posts (Item D) and install new metal Bollard (also Item D). The metal yellow Bollard shall be around 42-inches high and concreted into the earth at a minimum of 2 feet with a 6-inch diameter set in the middle of the proposed new asphalt walkway in line with the existing 2-rail wood fence. Contractor shall install new 2x6 wooden rails to replace the rails that were removed and leaving an eight foot opening between the newly installed wood posts (Item C). Sketch #5.2 shows the details of the typical wooden 2-rail access control fence. 1.27) The contractor shall seal coat the existing various asphalt walkways north of the Miracle League Field as shown on Sketch #6. 1.28) The contractor shall abide by the PWD Manual 2 Specifications for asphaltic seal coat, asphalt cement concrete, and Portland cement concrete. For application of seal coat and asphalt cement concrete overlay, the contractor shall power sweep the existing area prior to tack coat application. Tack coat shall be heated and applied in a thin uniform layer at a rate of 0.03 and 0.15 gallons per square yard. Asphalt cement concrete (1-inch overlay) may vary in thickness between 1-inch to 1 1/2 -inches thick and shall be Type S-1. All intersecting walkway will have radius transitions and upon completion the contractor shall install 70/30 mix and sod at edges of all areas disturbed by construction activities, using fine hand grading and supplying topsoil mixture to bring Soil/Sod to even elevation with edge of new asphalt placement. All requests for information (RFI) must be submitted in writing by 05/26/2025 to Penelope.Quintas@miamidade.gov and copy the Clerk of the Board at clerkbcc@miamidade.gov. NO PHONE CALLS WILL BE ACCEPTED. Verbal statements made by the County or the Owners Representative that are not contained in an RPQ or addendum to the RPQ are not binding on the County and should not form any basis for a bidders response to an RPQ. Anticipated Start Date: 6/1/2025 Calendar Days for Project Completion: 180 Bid Bond Required: YES Performance & Payment Bond Required: YES License Requirements: Primary: Paving; Concrete Finishing; Concrete Work; Building Contractor
Bid Results
Playgrounds / Parks / Athletic Fields
$349,335.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
July 7, 2025
11201 SW 24th St, Miami, FL
Related To This Project
Miami, FL
Bid Date: Sep 09 2025
Miami, FL
Bid Date: May 26 2025
Miami, FL
Bid Date: Jul 30 2025
Miami, FL
Bid Date: Jun 02 2025
Miami, FL
Bid Date: May 20 2025
Miami, FL
Bid Date: May 15 2025
Miami, FL
Bid Date: May 29 2025
Miami, FL
Bid Date: Jun 10 2025
Miami, FL
Bid Date: Jun 10 2025
Miami, FL
Bid Date: Jul 30 2025
Miami, FL
--
Miami, FL
Bid Date: Jun 10 2025
Miami, FL
Bid Date: Jul 01 2025
Miami, FL
Bid Date: May 30 2025