BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2025 at 8:00 PM

Updated September 12, 2025

Site work and paving for a sidewalk / parking lot in Pensacola, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Question Deadline 08/22/2025 at 10:00 AM CT Any questions concerning the bid should be addressed and submitted in writing Dedria Lunderman, Purchasing Manager City of Pensacola 222 W. Main St. Pensacola, FL 32502 purchasing@cityofpensacola.com For questions, contact 850-435-1835 location Street Name Street Segment & Linear Feet Anderson St. N. Davis Hwy. to 9th Ave. (463 ft.) Scott St. 9 th Ave. to 12th Ave. (997 ft.) Avery St. N. Hayne St. to N. 9th Ave (1310 ft.) Bid Alternate North Q St. Jackson St. to Cervantes St. (670 ft.) The goal of this project is the installation of new sidewalk and replacement of dilapidated sidewalks identified as needing repairs or improvements. These sidewalks serve neighborhoods with poor walkability. The 2025 Sidewalk project also includes the improvement of several driveway sections that intersect the sidewalks within the ROW. Those improvements shall be constructed to the provided standard driveway detail. The standard sidewalk is 4" thick but shall be 6" thick where the sidewalk crosses a driveway apron. On streets lined with concrete curbs, a curb cut will be required for the driveway improvements. On streets without curbs, the specified driveway dimensions still apply, but driveways do not require "tie-ins" or construction of new curb. Due to grading constraints, some sections of sidewalk will have a 6" curb or knee wall constructed per the included City details. This project also calls for the placement of thermoplastic pavement striping for crosswalks and stop bars. and for the installation of detectable warning plates for pedestrians. Thermoplastic shall be placed beginning at the edge of asphalt. o Note that "Q" Street plan set shall be considered a Bid Alternate in its entirety. All work called for in the plans shall be tracked separately from the Scot, Anderson, and Avery Street plans. Utility coordination is the responsibility of the contractor. Surveys indicate the presence of buried and overhead utilities in the project area All the project areas are relatively flat, but erosion and sedimentation control measures should be taken where needed to prevent soil runoff away from the project areas. Additionally, work will be performed near vehicular traffic. Maintenance of Traffic (MOT) plans are required and shall be furnished by the contractor. This project has a 90 calendar-day completion goal following Notice to Proceed Bid open https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NGFmMTE0NzktMzU1NS00ODE0LWIyODMtMzM3NzJkZTRkMzkw%40thread.v2%2F0%3Fcontext%3D%257B%2522Tid%2522%253A%25222c65e340-c270-42f3-85c0-f94ce72e1e36%2522%252C%2522Oid%2522%253A%2522ee43ac82-7f3f-4ee7-9087-c5d0dc949018%2522%252C%2522IsBroadcastMeeting%2522%253Atrue%252C%2522role%2522%253A%2522a%2522%257D%26btype%3Da%26role%3Da%26anon%3Dtrue&type=meetup-join&deeplinkId=34897399-af3e-4fbf-a226-30a1159ad27b&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true CONSTRUCTION BOND

Award

Sidewalks / Parking Lot

$145,618.00

Public - City

Paving, Site Work

75

10

93

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
37
Bidding Soon
703
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

October 3, 2025

Project location map

Multiple Locations, Pensacola, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.