Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 3, 2025 at 8:00 PM

Updated July 4, 2025

Site work and paving for a bridge / tunnel in Dallas, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

District/ division Dallas County (controlling project) Dallas Let type Statewide Let - CST Highway (ccsj) US 67 Type of work (controlling project) Bridge Maintenance Bidder pre-qualification waiver No Limits From * Limits To 0.066 Guaranty: $100000 Working day type (ccsj) working days Max. Maximum number of working days 247 TXDOT : Bridge Maintenance - US 67 Contractor questions on this project are to be addressed to the following individual(s): Nathan Petter Nathan.Petter@Txdot.gov Dung Nguyen Dung.Nguyen@Txdot.gov

Bid Results

Bridges / Tunnels

$4,922,876.00

Public - State/Provincial

Paving, Site Work

266

12

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
178
Bidding Soon
4,365
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

September 1, 2025

Project location map

US-67, Dallas, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed