Published July 18, 2025 at 8:00 PM

Updated November 7, 2025

Site work for a water / sewer project in Glenham, South Dakota. Working plans call for site work for a water / sewer project.

Est. Value Notes: $700,000 to $800,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Description: o Removal and disposal of an existing coal fired boiler, piping, augers, flue, appurtenances, etc. o Removal and disposal heat pumps, piping, etc. o Removal and disposal of existing heating water solution and replacement with new glycol solution. o Provide two (2) LP fired boilers with all piping, wiring, valves, appurtenances, equipment, ventilation, etc. Boilers will be set on a new housekeeping pad. o Provide onsite 18,000-gallon LP storage tank/facility, provide underground LP gas line, electric vaporizer, underground electric lines, etc. o Provide new heating water pumps on a new housekeeping pad, piping, valves, etc. o Remove existing wiring, conduit, equipment, etc. that has been identified for removal. o Installation of new destratification fans and associated controls (Add Alternate 1). o Replacement of existing hot water unit heaters with new and additional hot water unit heaters and associated Building Automation System controls (Add Alternate 2). o Provide all necessary electrical improvements including wiring, conduit, equipment, etc. for the proposed and future equipment. Work may include but not limited to, removal of existing equipment, mechanical and electrical components. Contractor will need to repair/patch all floors, wall & roof penetrations that were left from the equipment that is removed. Contractor shall provide housekeeping pads and cut existing concrete surfacing and patch to install new LP gas line and underground electric lines. Contractor shall provide electrical wiring, conduit, equipment for the proposed and future equipment/facilities. Contractor will also need to provide site grading and surfacing for the LP storage tank. Additionally, the Contractor will be responsible for all other miscellaneous work required not herein mentioned but inferred from the construction Contract Documents. The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents All bids must be accompanied by Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to the Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. Question Deadline 05/27/2025 Project has been cancelled

Final Planning

Water / Sewer

$800,000.00

Public - County

Site Work

25

18

5

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
39
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

July 22, 2025

Project location map

29680 SD-1804, Glenham, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.