Published June 3, 2025 at 8:00 PM
Updated June 4, 2025
Site work, paving and new construction of a mixed-use development in Centerville, Iowa. Completed plans call for the construction of a one-story above grade educational facility; for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Package 1 - Outside Electrical Relocation o Provide and install a 120/240 volt single phase 600 AMP main breaker NEMA 3R panel board set on Unistrut or similar product set in concrete. o The panel board shall include: o 2 x 200 AMP 2 Pole Breakers o 1 x 150 AMP 2 Pole Breaker o 1 x 100 AMP 2 Pole Breaker o 6 x 20 AMP 1 Pole Breakers o 12 Provisional spaces for future use o Provide new grounding per code. o Reconnect existing 150 AMP feeder and existing 200 AMP feeder to the baseball press box. o Provide and excavate new 200 AMP feeder to the new concession stand. o Provide and excavate new 100 AMP feeder to the new press box. o All pathways in 2-inch conduit. Add Alternate 2 includes sidewalks, and patio labeled on the site plans as Add Alternate 2. o Contractors should provide a complete bid for the base and a square yard price for each add alternate separately. o Contractor responsibilities include aggregate backfill, compaction, dewatering, rough grading, fine grading, and concrete curing. o Protect any surface from damage caused by the contractor's work. o Owner will provide benchmark elevations and established control points. o Maintain a clean and safe work area. o All concrete shall be a 4000 PSI mix. Package 3 - Concession Building Construction Scope of Work: Furnish and install a 40x100 single story building with the following specifications corresponding to the attached building plans. o General Information: o Building Use: Concession stand and public restroom facility o Construction Type: Wood frame, steel-clad, slab-on-grade structure o Framing Dimensions: 2x6 exterior wall studs at 16" on center Structural Components: o Exterior Walls: Treated bottom plate with Sill Sealer, Double Top Plate, 2x6 wood studs @ 16" O.C., 7/16" OSB sheathing, Tyvek house wrap under wall steel o Roof Framing: 5/8" OSB sheathing, synthetic roof felt o Roof Trusses: Engineer-stamped drawings, 4/12 pitch, 12" overhang with speed lap soffit o Interior Walls: 2x4 wood studs @ 16" O.C., treated bottom plate with Sill Sealer, double top plate o Insulation: 2" closed-cell spray foam in walls, R-48 fiberglass blown-in ceiling, batt insulation in interior walls o Ceiling Finish: Perforated white steel on all ceiling areas Exterior Finishes: o Roof and Wall Cladding: 26-gauge steel for both roof and wall panels, 26- gauge metal trim and accessories to match panels, vented ridge cap o Soffit: Speed lap soffit on overhangs and porch ceiling areas o Interior Finishes: o Mechanical Room Walls: 5/8" CDX plywood o Wall Type A: 29-gauge white liner steel o Wall Type B: Gray Truss Core paneling o Doors and Windows: o Windows: Andersen 100 Series, all black finish o Walk Doors: Hollow metal doors and frames o Garage Door: Haas 700 Series, 26-gauge, insulated, steel-backed, black color o Bathroom Wall Partitions: Phenolic Black Core with a 25-year warranty and stainless steel fasteners. o June 10: Notice to proceed o August 1: Begin Construction o November 1: Construction completion
Post-Bid
Educational
$750,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2025
August 1, 2025
721 N 1st St, Centerville, IA
Related To This Project
Centerville, IA
--
Centerville, IA
Bid Date: Oct 15 2025
Centerville, IA
Bid Date: Nov 07 2025
Centerville, IA
Bid Date: Jul 31 2025
Centerville, IA
Bid Date: May 22 2025
Centerville, IA
Bid Date: Apr 15 2025
Centerville, IA
Bid Date: Feb 20 2025
Centerville, IA
Bid Date: Jan 20 2025
Centerville, IA
--
Centerville, IA
Bid Date: Nov 05 2024
Centerville, IA
Bid Date: Dec 17 2024
Centerville, IA
--
Centerville, IA
Bid Date: May 17 2024
Centerville, IA
Bid Date: Apr 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.