BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

This is a service / maintenance or supply contract in Saint Paul, Minnesota. Contact the soliciting agency for additional information.

Only for selected firms from the SPPS Board of Education (BOE) approved slate of architects and engineers Question Deadline 05/16/2025 at 2:00 PM CT Responders shall submit in writing all project and RFP questions, including any questions from site visit, via online. PURPOSE Saint Paul Public Schools, Independent School District #625, is requesting proposals for Commissioning (Cx) and Testing, Adjusting, and Balancing (TAB) Services for the 740 York RTU Replacement and Re-Roof project. The intent of this project is to replace roofing on the school portion of the building, replace RTUs, and address deterioration in decorative cornice. SPPS will first contract with the selected firm for services for all phases, as quantified in the AIA C203-2017 Standard Form of Consultant's Services: Commissioning, as modified by the Owner (See Attachment 1). Once the scope of the project is confirmed through the Design phases, SPPS will amend the Cx and TAB contract, if necessary, to reflect the final design scope and construction schedule and phases. With mutual agreement, the proposed fee per Section 3.05 below, will be adjusted to reflect the final scope and schedule decisions. The 740 York building houses two programs: The staff of the Online School and the LEAP High School program, an Alternative Learning Center (ALC) high school serving English-languagelearner immigrant and refugee students. The original portion of the 740 York building was constructed in 1911. Additions were added in 1925, 1926, 1965, and 2000. The existing roof and Roof Top Units (RTUs) date from the 2000 remodeling and addition project. The scope of this project includes replacement of approximately 42,300 square feet of roof and replacement of five (5) RTUs and addressing leaking through the parapet and the decorative metal flashing drip edge detail The preliminary construction cost estimate is $3,250,000 to $3,750,000. This range of values includes all hard construction costs, including prime contractor general conditions, inflation multiplier, and estimating/design contingency. It does not include construction contingency (10%), and reimbursables, or SPPS provided furniture (not in design scope) or SPPS provided instructional audio-visual equipment. The primary point of contact for proposals is: Saint Paul Public Schools Purchasing & Contract Services Javier Gonzalez Contract Manager Email: javier.gonzalez@spps.org A. This RFP is being sent to select commissioning firms from the BOE approved slate of architects and engineers. SPPS will award (or not) the work at its sole discretion based on the criteria provided in PART 3. B. Proposals deemed noncompliant with the format and information requirements as detailed in PART 3 may be eliminated from further review and consideration. The remaining Proposals will be reviewed by an evaluation committee and scored based on criteria defined in PART 3, including quality and completeness. SPPS does not favor any one responder or firm. C. SPPS reserves the right to accept or reject any or all of the Proposals, any parts of Proposals, and to waive minor deficiencies or informalities in the Proposal. A deficiency or informality is minor if, in the judgment of SPPS, it does not provide a material advantage to a responder or prejudice the rights of other responders. D. SPPS retains the right to negotiate fees and services The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Educational

$3,750,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

12

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
104
Bidding Soon
1,541
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

Project location map

Multiple Locations, Saint Paul, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.