Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 24, 2025 at 8:00 PM
Updated July 25, 2025
Site work for a swimming pool in Walnut Creek, California. Completed plans call for site work for a swimming pool.
The Project includes, but is not limited to, performing the following Work: 1. Construction survey and layout, verification of subgrades, lake and pond outline, pipelines, and all associated facilities. 2. Subgrade and grade modifications required for Nature Lake and the Pond improvements, including mass and fine grading. Finish grades to be as indicated on the Contact Documents. 3. Removal of all trash and debris from the bottom of the Pond once drained. 4. Demolition of portions of the existing shoreline wall, retaining wall, boat dock, etc. 5. Earthwork (including stockpiling, hauling, import of engineered fill, and export). 6. Installation of a membrane as set forth on the Contract Documents at Nature Lake and the Pond. 7. Installation of a soil liner at Nature Lake and the Pond. 8. The installation of reinforced concrete veneer at the shoreline wall, as indicated on the Contract Documents. 9. Decorative stained and eroded shoreline treatment, including the construction of a five-foot mockup of the shoreline for approval. 10. Floating pond fountain installation, anchors, electrical cable, conduit, wire, liner penetration, equipment pad, and control panel. 11. Pond aeration system includes tubing, compressor, diffusers, valve boxes, conduit, wire, liner penetration, equipment pad, and outdoor enclosure. 12. Pond electrical conduits, wiring, junction box, and connection to a power source. 13. Miscellaneous construction as shown on the Contract Documents or as set forth in the Project Manual. 14. As-builts and other close-out documents, including warranties, operating and maintenance manuals, etc. 15. Contractor shall provide a comprehensive Project logistics plan within five (5) days of the award of contract. 16. Protection of the top edge of the new shoreline wall prior to the installation of sidewalks, which are to be installed as part of Phase 2. 17. Immediately upon mobilization, establish a secure perimeter of Phase 1 work by installing a fence of not less than seven (7') feet in height with the appropriate number of gates that can be secured after normal working hours. Installation and ongoing maintenance of tree protection, etc. 18. Strict compliance with all Project Conditions of Approval and Mitigation Measures set forth in permits and approvals issued by Federal and State authorities having jurisdiction. 19. Completely drain the Pond, maintain the existing soil liner, partially drain the Lake, install cofferdams, and perform ongoing dewatering from inside the cofferdams. 20. Reconstruction and restoration of the Pond and Lake. 21. The expansion of Nature Lake. 22. Protection of flora and fauna. 23. Installation and ongoing maintenance of the SWPPP. Online Q&A Yes Q&A Deadline 05/22/2025 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date 7/2/2025 Project Duration 75 Working Days Liquidated Damages $3,000 per Calendar Day License Requirements Class [A} General Engineering
Award
Swimming Pools
$1,992,010.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2025
July 2, 2025
301 N San Carlos Dr, Walnut Creek, CA
Related To This Project
Walnut Creek, CA
--
Walnut Creek, CA
Bid Date: Oct 30 2025
Walnut Creek, CA
Bid Date: Aug 07 2025
Walnut Creek, CA
Bid Date: Aug 18 2025
Walnut Creek, CA
--
Walnut Creek, CA
Bid Date: Oct 08 2025
Walnut Creek, CA
--
Walnut Creek, CA
Bid Date: Nov 06 2025
Walnut Creek, CA
--
Walnut Creek, CA
Bid Date: Jun 04 2025
Walnut Creek, CA
--
Walnut Creek, CA
Bid Date: Apr 01 2021
Walnut Creek, CA
Bid Date: Aug 07 2025
Walnut Creek, CA
Bid Date: May 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
