BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Renovation of a municipal facility in Lake Elsinore, California. Completed plans call for the renovation of a municipal facility.

The contractor will furnish a proposal and price for all materials, labor and equipment to complete the job and deliver the scope. The contractor must familiarize himself with the site, all details of the work required, and existing conditions. The contractor must be a going entity for at least 3 years, and produce a valid certificate of liability insurance, which must be on hand before work begins. The Contractor shall perform at least 70% of all on site work of the total amount of work to be performed under the contract with its own organization. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction, and the City determines that the reduction would be to the advantage of the City. All work will be permitted and inspected through the City of Lake Elsinore Building Department. General Requirements: o Mobilization & Demobilization Including Construction Schedules o (Not To Exceed 3% of Total Bid) o Labor Material Bond and Performance Bond o Drywall, Drywall Tape & Mud, and Drywall Finish Texture o Sound Insulation all Walls, Ceilings and Third Floor Roof Online Q&A Yes Q&A Deadline 05/22/2025 2:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 65 Days Liquidated Damages $1,000 per calendar day License Requirements Contractor shall have a Class "B" or a Class "A" or a combination of Specialty Class "C" licenses.

Award

Municipal

$1,070,000.00

Public - City

Renovation

14

16

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
730
Active Projects
389
Bidding Soon
3,528
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

July 4, 2025

Project location map

100 S Main St, Lake Elsinore, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.