Site work and renovation of a civil project in Oak Ridge North, Texas. Completed plans call for the renovation of a water / sewer project.

Construction of Lift Station No. 1 improvements include, but not limited to, cleaning and de-gritting the wet well, removing the existing wet well coating, surface preparation, application of cementitious repair mortar to the damaged areas up to 1" thick, application of 100% solids epoxy coating to the entire interior of the wet well including the floor and underside of the top slab; removal and replacement of the existing riser piping, including the penetration into the wet well wall; removal and replacement of all plug, check, and air-release valves for all above ground piping; coating for riser piping, above ground piping, and all valves; removal of the existing fall protection net and replacement with rigid fall protection; replacement of all support hardware for the interior manhole drop upstream of the wet well; replacement of the control panel indicator light for "high-level"; blasting and recoating the generator enclosure. Question Deadline 05/19/2025 In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer Bidders should contact the Engineer not less than 72 hours before bid opening to secure any addenda that may affect bidding. The project site locations are as follows: Lift Station No. 1 - 27211 Oak Ridge Park Dr., Conroe, TX 77385 Lift Station No. 2 - 27427 Hanna Rd., Conroe, TX 77385 Installation, rental, and operation of a temporary bypass pumping system for the duration needed by the contractor to complete the work for the construction of Lift Station No. 1 improvements. Construction of Lift Station No. 2 Improvements including, but not limited to, cleaning and de-gritting the wet well, removing existing wet well coating, surface preparation, application of cementitious repair mortar to damaged areas up to 1" thick, application of 100% solids epoxy coating to the entire interior of the wet well including the floor and underside of the top slab; removal and replacement of air-release valves, valve vault piping clamps, and guide rail support bracket hardware; coatings for above ground valves and appurtenances; blasting and surface preparation and application of a cold-galvanized coating system for the wet well vent piping; repair of the existing conduits, floodlight lamps, autodialer conduits, remounting terminal blocks inside the terminal box, and replacement of the control panel fuses. Installation, rental, and operation of a temporary bypass pumping system for the duration needed by the contractor to complete the work for the construction of Lift Station No. 2 improvements.

Award

Water / Sewer

$344,000.00

Public - City

Renovation, Site Work

11

19

7

5

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
4
Bidding Soon
2,363
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 23, 2025

Project location map

Multiple Locations, Oak Ridge North, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.