Published May 16, 2025 at 8:00 PM

Updated May 29, 2025

Site work for a road / highway in Rossford, Ohio. Completed plans call for site work for a road / highway.

In general the work consists of: This project includes the removal of the existing rectangular rapid flashing beacon installations and replacing with new pedestrian hybrid beacon signal crossings with extended curbs at SR-65/Elm Street and SR-65/Maple Street. Includes new sidewalk, traffic control signs and pavement markings. Question Deadline 05/17/2025 at 4:30 PM ET Any questions may be submitted in writing to Corrinne Lochtefeld, P.E., at clochtefeld@dgl-ltd.com or via phone (419) 535-1015. No questions will be accepted after this date/time. The Contractor Affirmatively Represents to the Local Contracting Authority That It is Not Subject to a Finding for Recovery Under Ohio Revised Code &9.24, or That It Has Taken the Appropriate Remedial Steps Required Under &9.24 or Otherwise Qualifies Under That Section. The Contractor Agrees That if This Representation is Deemed to Be False, the Contract Shall Be Void and Initio as Between the Parties to This Contract, and Any Funds Paid by the State Hereunder Shall Be Immediately Repaid to the Local Contracting Authority, or an Action for Recovery May Be Immediately Commenced by the Local Government and/or for Recovery Of Said Funds. The Contractor Must Secure and Maintain Valid Ohio Workers' Compensation Coverage Until the Project Has Been Finally Accepted by the Local Contracting Authority. A Certificate of Coverage Evidencing Valid Workers' Compensation Coverage Must Be Submitted to the Local Contracting Authority Before the Contract is Executed. The Contractor Must Immediately Notify the Local Contracting Authority, in Writing, if It or Any Subcontractor Fails or Refuses to Renew Their Workers' Compensation Coverage. Plans and Specifications With the Following in the Subject Line: Superior Street- Pedestrian Hybrid Beaconsplan Holde R Contractor Must Be Pre- Qualified With the Ohio Department of Transportation. During the Bidding for The Project, Contractors Must Submit Their Dbe Information Electronically to the Ohio Department of Transportation (Odot)'s Local Let Dbe Website at Time of Bid. Modification of Dbe Information Will Not Be Allowed After Bid Opening. Failure to Submit the Dbe Information Through the Website Will Constitute an Incomplete Bid. Bids Must Be Submitted on the Forms Contained Within the Bid Packet and Must Contain the Names of Every Person or Company Interested Therein, and Shall Be Accompanied by Either a Bid Guaranty and Contract Bond in the Amount of 100% Of the Amount Bid With Satisfactory Corporate Surety, or by a Certified Check on a Solvent Bank in the Amount of Not Less Than 10% of the Amount of the Bid, Subject to Conditions Provided in the Instructions to Bidders. Furthermore, the Contractor Must Notify the Local Contracting Authority, in Writing, if Its or Any of Its Subcontractor's Workers' Compensation Policies Are Canceled, Terminated or Lapse. The Failure to Maintain Valid Workers' Compensation Coverage Shall Be Considered a Breach of Contract Which May Result in the Contractor or Subcontractor Being Removed From the Project, Withholding of Pay Estimates and/or Termination of the Contract. In Accordance With Ohio Revised Code &153.03 and During the Life of This Project, the Contractor and All Its Subcontractors That Provide Labor on the Project Site Must Be Enrolled in and Remain in Good Standing in the Ohio Bureau of Worker's Compensation ("obwc") Drug-free Work- Place Program ("dfwp") or a Comparable Program Approved by the Obwc. The Successful Bidder Will Be Required to Furnish Satisfactory Performance Bond and Maintenance and Guarantee Bond In the Amount of 100% of the Bid. Any Bid May Be Withdrawn Prior to the Scheduled Closing Time for Receipt of Bids, but No Bidder Shall Withdraw His Bid Within 60 Days After the Actual Opening Thereof. In Accordance With Ohio Revised Code &164.05 (a)(6), to the Extent Practicable, the Contractor and Subcontractor Shall Use Ohio Products, Materials, Services and Labor in Connection With This Project. Contractor Agrees That It is Currently in Compliance and Will Continue to Adhere to the Requirements of Ohio Ethics Law as Provided by Section 102.03 and 102.04 of the Ohio Revised Code. The Owner Reserves the Right to Reject Any or All Bids, Waive Irregularities in Any Bid, and to Accept Any Bid Which is Deemed Most Favorable to the Owner. Domestic Steel Use Requirements as Specified in Ohio Revised Code &153.011 Apply to This Project.

Post-Bid

Roads / Highways

$449,407.00

Public - City

Site Work

24

5

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
317
Active Projects
165
Bidding Soon
2,333
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

June 27, 2025

Project location map

Superior St, Rossford, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.