Site work for a water / sewer project in Little Rock, Arkansas. Completed plans call for site work for a water / sewer project.
Direct any bid questions to Thomas Wray of Central Arkansas Water at (501)377-1221 or at Thomas. Wray@carkw.com. All bids must be accompanied by a Certified Check or Bid Bond in an amount equal to at least 5% of the total bid. The Commission reserves the right to waive formalities, reject any or all bids, and to accept the bid deemed to serve the best interest of Central Arkansas Water. INSTALLATION OF APPROXIMATELY 5,485 L.F. OF 12-INCH POTABLE WATER MAIN S. HARRISON ST. BETWEEN W. 12th ST. AND W. 28th ST. LITTLE ROCK, AR Question Deadline: 05/27/2025 If any person contemplating submitting a BID is in doubt as to the meaning of any part of the Contract Documents, he may submit to the OWNER Central Arkansas Water (501) 372-5161 Contract time is 270 consecutive calendar days. The work intended to be performed under this Contract shall include the furnishing and the installation of pipes, fittings, valves, hydrants and appurtenances, including wet and tapping connections and other structures, all as described on the Bid Form and Plans and to perform all other work incidental thereto. Items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the principal bid item requiring such work and/or materials, and the cost thereof shall be considered to be included in the bid price for the principal items. All work shall be performed in a professional manner, consistent with good workmanship practices, and shall meet total satisfaction and approval ofthe ENGINEER. The ENGINEER or his designated representative (INSPECTOR) may not be on the job site every hour that the CONTRACTOR is performing work. During the days the CONTRACTOR is allowed to perform WORK per the Contract Documents, the CONTRACTOR shall start WORK after dawn each day and complete the day's WORK by dusk each day. If the City in which the WORK is performed has a more restrictive work or noise ordinance, that requirement shall be followed. Some WORK may be required to be performed at night, weekends, or low water usage times as directed by the Contract Documents, Construction Plans, or the ENGINEER. Certain work, including but not limited to placement of reinforcement steel, placement of concrete, valve operation, pressure and leakage tests, cut and plugs, etc., must be inspected and approved by the ENGINEER before start, completion, or backfill. The CONTRACTOR shall coordinate the inspection ofthis type of work with the ENGINEER. The CONTRACTOR shall notify the ENGINEER sufficiently in advance of backfilling or concealing any WORK or facilities to permit proper observation. Ifthe WORK or facilities are concealed without approval or consent of the ENGINEER, the CONTRACTOR shall uncover for observation and recover such facilities all at his own expense, when so requested by the ENGINEER. Unsatisfactory work or materials shall be removed and replaced at the CONTRACTOR'S expense. Penalties will be assessed against the CONTRACTOR and/or DEVELOPER for failure to conform or comply with the specifications as detailed in Section 40 ofthis specification. The CONTRACTOR shall furnish all materials for concrete, mortar or masonry, lumber for bracing trenches, shoring obstructions, blocking, barricading and bridging the work as it progresses, temporary road resurfacing materials, pipes and materials for repair or replacement of sewers, drains, and other utility structures and all other materials, necessary for satisfactoiy completion of the project as specified, except those materials furnished by the OWNER
Award
Water / Sewer
$2,296,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2025
August 4, 2025
S Harrison St, Little Rock, AR
Related To This Project
Little Rock, AR
Bid Date: May 22 2025
Little Rock, AR
--
Little Rock, AR
--
Little Rock, AR
Bid Date: Jun 05 2025
Little Rock, AR
Bid Date: May 27 2025
Little Rock, AR
Bid Date: May 28 2025
Little Rock, AR
Bid Date: Jun 12 2025
Little Rock, AR
Bid Date: Jun 12 2025
Little Rock, AR
Bid Date: May 28 2025
Little Rock, AR
Bid Date: Sep 19 2025
Little Rock, AR
Bid Date: Jul 01 2025
Little Rock, AR
Bid Date: May 20 2025
Little Rock, AR
Bid Date: May 23 2025
Little Rock, AR
Bid Date: May 21 2025
Little Rock, AR
Bid Date: Jun 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.