EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Renovation of a multi-residential development in North Battleford, Saskatchewan. Completed plans call for the renovation of a multi-residential development.

Basement Development, 1712 105th Street in North Battleford, Saskatchewan Copies of the Tender Documents may be obtained from The Battlefords Housing Authority at (306) 445-4393. Tenders $100,000.00 and over shall be accompanied by an electronic copy of a Bid Bond in an amount not less than 10% of the Tender Price written in the name of the Owner. The successful contractor will be expected to supply the original Bid Bond prior to the award of the contract. Certified cheque will NOT be accepted as bid security. The lowest or any tender will not necessarily be accepted. The Owner reserves the right to reject tenders from parties without reasonable acquaintance with the class of work specified. An approved contractor application must be completed, and evidence of competency shall be provided if requested. These reservations shall apply equally to subcontractors. SCOPE OF WORK A. GENERAL: 1.) Complete work as described for 1712 105 th Street North Battleford, Saskatchewan. 2.) Description of the Work: a. The purpose of this project is for Basement Development at 1712 105 th Street as outlined in section C of the scope of work. b. The Contractor shall check and verify all site dimensions on an individual basis. c. The Contractor shall not make any claim to The Battlefords Housing Authority (TBHA) for miss measured or improperly measured work. 3.) Contractor Responsibilities: a. This scope of work, together with the attached general requirements, specifications and rejuvenation standards MUST be observed. b. All necessary fees and/or permits shall be the responsibility of the contractor and copies submitted upon final billing. c. Any items or areas where repair is required must be returned to an “as new” condition. d. The Battlefords Housing Authority reserves the right to reject all poor workmanship. e. Work must be sequenced to avoid disruption to the tenants. f. Work shall not take place during inclement weather at the discretion of the Owner. g. The contractor is to work closely with The Battlefords Housing Authority (TBHA) to minimize disruption of services to tenants. h. Contractor is to perform work in a manner that will not jeopardize tenant security and will not jeopardize tenant or public safety. i. The Contractor shall respect the rights of the tenants and shall conduct themselves in a professional and courteous manner. j. Progress payments for materials or work completed must be requested and agreed to prior to the start of the project.

Post-Bid

Multi-Residential

$100,000.00

Public - State/Provincial

Renovation

4

16

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central Heating Equipment, Furnaces
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
39
All Active Projects
6
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 23, 2025

img_map_placeholder

1712 105 St, North Battleford, SK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.