Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated June 13, 2025
Renovation of an educational facility in Council Bluffs, Iowa. Completed plans call for the renovation of a primary / secondary education facility.
Lewis Central Community School District wishes to modify the existing geothermal heat pump system serving the west side of the building to include a closed-circuit fluid cooler and boilers to supplement the existing geothermal wellfield. The District will directly contract commissioning with a third party. The mechanical contractor shall cooperate with the Commissioning Authority to complete all commissioning activities. Titan Hill Intermediate School Geothermal Wellfield Modifications - 4125 Harry Langdon Blvd Council Bluffs, IA 51503 Any questions concerning clarification of this bid should be directed to: Andrew Pullmann , Morrissey Engineering 4940 North 118th Street Omaha, Nebraska 68164 Phone: (402) 491-4144 apullmann@morrisseyengineering.com Doc.Note- Documents will be available between the hours of 8:00 a.m. and 12:00 noon and 1:00 p.m. and 5:00 p.m., Monday through Friday. All bidders who require hard copies of bid documents shall place an order directly with A & D Technical Supply and shall pay all costs associated with printing and if applicable, all shipping costs. A. Commissioning is a systematic process of ensuring that all building systems perform interactively according to the design intent and the owner's operational needs. The CxA shall provide the Owner with an unbiased, objective view of the system's installation, operation, and performance. The commissioning process does not take away or reduce the responsibility of the installing contractors to provide a finished product, installed and fully functional in accordance with the Contract Documents. B. Commissioning is intended to enhance the quality of system startup and aid in the orderly completion and transfer of systems for beneficial use by the Owner. The CxA shall be the leader of the commissioning team, planning and coordinating all commissioning activities in conjunction with the design professionals, construction manager, subcontractors, manufacturers, and equipment suppliers. C. The General Contractor, Mechanical Contractor, Electrical Contractor, Temperature Control Contractor, and all subcontractors shall be responsible for cooperating and coordinating their work with the CxA. They shall also be responsible for carrying out all the physical activities required for installation of components and systems, and operating them during the commissioning process as required in this section. D. Commissioning, including functional tests, O&M documentation review, and training is to occur after startup and initial checkout and be completed before Substantial Completion. Final completion shall be accomplished no later than November 13th, 2025
Award
Educational
$406,489.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2025
June 12, 2025
4125 Harry Langdon Blvd, Council Bluffs, IA
Related To This Project
Council Bluffs, IA
Bid Date: Jun 05 2025
Council Bluffs, IA
Bid Date: Jun 03 2025
Council Bluffs, IA
Bid Date: May 28 2025
Council Bluffs, IA
Bid Date: Jun 24 2025
Council Bluffs, IA
Bid Date: Jun 25 2025
Council Bluffs, IA
Bid Date: Jun 18 2025
Council Bluffs, IA
Bid Date: Jul 07 2025
Council Bluffs, IA
Bid Date: Jul 07 2025
Council Bluffs, IA
Bid Date: May 09 2025
Council Bluffs, IA
--
Council Bluffs, IA
Bid Date: May 09 2025
Council Bluffs, IA
Bid Date: May 01 2025
Council Bluffs, IA
Bid Date: May 08 2025
Council Bluffs, IA
Bid Date: Apr 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
