BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Renovation of a playground / park / athletic field in Denver, Colorado. Completed plans call for the renovation of a playground / park / athletic field.

Reference Number 0000386819 Bid Intent Not Available Purchase Type: One Time Only- Delivery Date: No later than 9/15/25 The City and County of Denver, hereinafter referred to as the City, desires to solicit bids relating to the removal and replacement of City Park Greenhouse roof. The greenhouse portion of the project must be completed by September 15, 2025 at the latest. This deadline cannot be extended; therefore, the City asks that only suppliers who can confidently meet this deadline submit proposals. Note: The asphalt shingles portions of the roof can occur after the September 15, 2025 date. Question Deadline 05/27/2025 at 5:00 PM MT Questions are submitted online No, The City shall not be bound by and the Vendor shall not request or rely on any oral interpretation or clarification of this IFB. Therefore, any questions regarding this IFB are encouraged and should be submitted in writing by email to: City Procurement Analyst: Ruth Bruski E-Mail: ruth.bruski@denvergov.org Due to the hail damage suffered during the hailstorm back in June of 2024, 90-95% of the greenhouse panels on the south side roof of the City Park Greenhouse have been ineffective in keeping out the rain and will need to be replaced before any further damage can occur. The roof currently leaks above existing electrical services and is a safety hazard to everyone inside of the building. There are a few panels on the north side of the building that were not serviced when they replaced those roof panels back in 2018. The current shingle roofs, while serviceable, will need to be replaced soon due to age and the asphalt constantly clogging the gutters Green House Roof - Base Scope Overview: 1. Remove and dispose of all damaged panels at all green houses on south side of facility, replace with new polycarbonate panels. Contractor to match existing panels and system. 2. DPR has +-30 new panels (6'x17' Gallina USA PoliCarb - 10mm 2-wall) on site for contractor review and confirmation on during the pre-bid meeting. Panels can be used as part of the replacement project. 3. Confirm the number and size of panels needed based on existing panels and field verification. 4. Replace the approximate 11 panels located on the north roof, Contractor to field verify with DPR input and approval. 5. Project roof panel replacement shall be completed no later than September 15 th , 2025

Post-Bid

Playgrounds / Parks / Athletic Fields

$60,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
101
Bidding Soon
1,355
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.