BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Site work, paving and new construction of a mixed-use development in El Paso, Texas. Working plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Construction Manager at Risk shall provide preconstruction services to include consultation, value engineering, constructability reviews and cost estimating during the design phases of the work, construction services, closeout and warranty phase services for the Cultural Center and Park Headquarters at HuecoTanks State Park and Historic Site. Provide a new Cultural Center (visitors' center) that will function as interpretive space and new Park Headquarters (10,800 sf), Provide an Amphitheater/Outdoor Community Grounds gathering area to be associated with Cultural Center (5,600 sf). Provide Landscape (for areas affected by minimal disturbance and/or interpretive areas) Provide a new roadway (2,625 lf) to the Cultural Center Provide a new parking lot (130 spaces) to serve the Cultural Center. Provide a new connecting trail (600 lf) to/from the Cultural Center Relocate/replace parking (9 parking spaces for Escontrias) to allow for direct viewscape from existing HQ and create an opportunity for a future landscape setting to reflect the era of inhabitation. Essential repairs of existing Headquarters (900 sf), replace roof, and upgrade restroom. Upgrade the existing connecting trail (900 lf) to/from Escontrias. Essential repairs to Escontrias ranch house (1,675 sf) to include a security system and stabilization repairs. For planning purposes, the preconstruction performance period is estimated to be three hundred sixty-five (365) calendar days. The construction performance period is projected for a term of seven hundred thirty (730) calendar days except as may be otherwise amended or negotiated. The total contract performance period is estimated to be one thousand ninety-five (1,095) calendar days after Notice to Proceed.

Final Planning

Playgrounds / Parks / Athletic Fields

$16,100,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
172
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

February 16, 2026

Project location map

6900 Hueco Tanks Rd, El Paso, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.