BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated November 7, 2025

Site work and renovation of a civil project in Wahpeton, North Dakota. Working plans call for the renovation of a water / sewer project; for site work for a water / sewer project; and road / highway.

Bid is cancelled "As per the owner the project has been cancelled. team is actively seeking updated information." This project consists of the following approximate quantities: 6,650 LF PVC Sanitary Sewer Pipe 2,550 LF PVC Sanitary Forcemain Pipe 1 LS Sanitary Sewer Lift Station and Electrical 8,450 LF PVC Pipe Watermain 650 LF PVC Watermain-Directionally Drilled 11,000 LBS Ductile Iron Fittings 10,020 LF RCP Storm Sewer Pipe 1 LS Storm Sewer Pump Station and Electrical 10,900 CY Borrow 148,500 CY Pond Borrow Excavation 129,000 CY Unclassified Excavation 70 ACRE Seeding 10,015 SY Erosion Control Blanket Traffic Control and all miscellaneous work necessary therefor and incidental thereto. Any technical questions may be directed to Damon DeVillers at 701-642-5521 or damon.devillers@interstateeng.com . The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. The bid shall be accompanied by a Bidder's Bond submitted electronically on online in the amount of five percent (5%) of the full amount of the bid, executed by the Bidder as Principal and by a Surety Company authorized to do business in North Dakota. If the Principal's bid is accepted by Richland County and the contract awarded, the principal, within ten (10) days after the Notice of Award, will be required to execute and effect a contract in accordance with the terms of the principal's bid and any requirements and conditions of the Owner. The Contractor will be required to commence construction, and in an approved sequence, complete all of the work for the project as noted below: 1. Substantial Completion - December 5, 2025. 2. Final Completion - May 15, 2026. The OWNER retains the right to reject any or all of the bids submitted and to waive any informality in any bid and to hold all bids for a period not to exceed thirty (30) days from said date of opening and to hold the three low bids and bid securities for a period not to exceed sixty (60) days from said date of bid opening. Bid open description: All bids submitted will be opened and read aloud via video conference. A link to attend the live video conference bid opening will be sent to online.

Final Planning

Water / Sewer

$11,600,000.00

Public - City

Renovation, Site Work

325

25

128

21

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
14
Bidding Soon
236
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

March 17, 2026

Project location map

Multiple Locations, Wahpeton, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.