BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Site work for a water / sewer project in Richmond, Virginia. Completed plans call for site work for a water / sewer project.

The City of Richmond, Virginia, seeks bids from qualified firms to provide general contracting services for the construction of the CSO 019A, CSO 19B, and Hampton St Pump Station Improvements Project. The Project will entail modifying regulator structures and will include maintenance of traffic, grading, erosion control measures, and restoring the site to the original contours, among other services The Project is located at these three sites: A. CSO 019A-Intersection of Hampton Street and Colorado Avenue, Richmond, VA B. CSO 019B-Intersection of Hampton Street and New York Avenue, Richmond, VA C. Hampton Pump Station-1900 Hampton Street, Richmond, VA A. The Work at CSO 019A shall include the following (along with all appurtenant Work): 1. Erosion and sediment control measures and site security features. 2. Temporary flow control system in accordance with Specification Section 01 57 28, (Temporary Flow Control). 3. Implementation of a maintenance of traffic plan. 4. Excavation of the structure and demolition of the manholes and top slab. 5. Demolition of Brown and Brown regulator, orifice plate along with stairs and railing. 6. Extension of the structure walls and casting of a new top slab with manhole frame and covers. 7. Coordinating with Dominion Electric and providing a new electrical service to the site. 8. Installation of electrically actuated slide gate and access platforms. 9. Installation of instrumentation, and controls along with associated conduit and wiring. 10. System startup and training. 11. Cleanup, landscaping, and site restoration. 12. Supply and installation of all other appurtenances and related Work required to complete the Project and as described and shown in the Contract Documents. B. The Work at CSO 019B shall include: 1. Erosion and sediment control measures and site security features. 2. Temporary flow control system in accordance with Specification Section 01 57 28, (Temporary Flow Control). 3. Implementation of a maintenance of traffic plan. 4. Demolition of Brown and Brown regulator. 5. Installation of instrumentation along with associated conduit and wiring. 6. Installation of an Emergency Pump Connection ("EPC"). 7. Supply and installation of all other appurtenances and related work required to complete the project and as described and shown in the contract documents. C. The Work at the Hampton Pump Station shall include: 1. Implementation of a temporary flow control system, in accordance with Specification Section 01 57 28 (Temporary Flow Control). 2. Demolition of mechanical, heating and ventilation and electrical gear. 3. Installation of electrically actuated slide gate. 4. Coordinating with Dominion Electric and providing a new electrical service to the site. 5. Structure modifications and installation of HVAC system. 6. Installation of electrical gear to include exterior cabinets with generator connection, along with a MCC, panels, conduit, and wiring. 7. Work associated with the MCC includes installation of gear to operate the existing two pumps. 8. Installation of instrumentation, and controls along with associated conduit and wiring. 9. Installation of sump pump. 10. System startup and training. 11. Cleanup, landscaping, and site restoration. 12. Supply and installation of all other appurtenances and related Work required to complete the Project and as described and shown in the Contract Documents. D. The Work shall also include: 1. Furnishing of all labor, material, superintendence, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services, and other means of construction that are necessary or proper for the performance and completion of the Work. 2. Sole responsibility for adequacy of plant and equipment. 3. Maintaining the Work area and site in a clean and acceptable manner. 4. Maintaining existing facilities in service at all times, except where specifically provided for otherwise herein. 5. Protecting finished and unfinished Work. 6. Repairing and restoring Work damaged during construction. 7. Furnishing as necessary proper equipment and machinery, of a sufficient capacity, to facilitate the Work and to handle all emergencies normally encountered in Work of this character. 8. Furnishing, installing, and protecting all necessary guides, track rails, bearing plates, anchor and attachment bolts, and all other appurtenances needed for the installation of the devices included in the equipment specified. Make anchor bolts of appropriate size, strength and material for the purpose intended. Furnish templates and shop drawings for installation. The person submitting the request shall be responsible for its prompt and actual delivery by Wednesday, June 4, 2025 11:00 am. PROJ - E5X7170

Award

Water / Sewer

$4,729,209.00

Public - City

Site Work

63

30

57

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
90
Bidding Soon
1,631
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 18, 2025

Project location map

Hampton St, Richmond, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.