BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 13, 2025

Site work and paving for a road / highway in Heber City, Utah. Working plans call for site work for a road / highway; and for paving for a road / highway.

Wasatch County Pavement Preservation Project. Question Deadline 05/27/2025 at 5:00 PM MT All questions regarding this ITB must be submitted through online. The substantial completion date for the Wasatch County Pavement Preservation Project is on or before August 31, 2025, regardless of weather conditions and other related problems. Bid Bond or certified check in the amount of 5% of total bid. 1. A performance bond satisfactory to the County in an amount equal to 100% of the price specified in the contract, to assure the faithful performance of the contract, for the protection of Wasatch County, to be held until final acceptance by Wasatch County of all aspects of this project; and 2. A payment bond satisfactory to the County in an amount equal to 100% of the price specified in the contract, for the protection of each person supplying labor, service, equipment, or material for the performance of the work provided for in the contract. It is agreed by the parties to this Agreement that in case all the work called for in accordance with this Agreement is not completed before or upon the Completion Dates set forth in this Agreement, damage will be sustained by Wasatch County, and that it is and will be impracticable to determine the actual damage which Wasatch County will sustain in the event of and by reason of such delay, and it is therefore agreed that the Contractor will pay to Wasatch County $1500.00 per day for each calendar day between the Completion Date required herein for any specific roadway and the date of final acceptance thereof by Wasatch County, as liquidated damages and not as penalty. Wasatch County reserves the right to reject any or all bids or waive minor irregularities when to do so would be in the best interests of Wasatch County. Minor irregularities are those which will not have a significant adverse effect on overall competition or performance levels. Any added provisions by the bidder reserving the right to accept or reject an award may result in rejection by Wasatch County

Final Planning

Roads / Highways

$400,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
52
Bidding Soon
1,010
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

December 12, 2025

Project location map

Multiple Locations, Heber City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.