Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 25, 2025 at 8:00 PM
Updated June 26, 2025
Site work and paving for a road / highway in Harrison, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 through 153.571 of the Ohio Revised Code. Bid security, furnished in Bond form, shall be issued by a surety company or corporation licensed in the State of Ohio in the full amount of one hundred percent (100%) of the bid amount. A 100% satisfactory performance and payment bond shall be required of the successful bidder. Each bid must contain the full name of the party or parties submitting the same and all persons interested therein. All bidders must comply with the prevailing wage rates on Public Improvements in Hamilton County and the City of Harrison as determined by the Ohio Department of Commerce, Bureau of Wage & Hour Administration. The City of Harrison reserves the right to reject any or all bids, or to accept or reject any part thereof. Prospective BIDDERS may address questions to John Goedde, PE, (jgoedde@teceng.com) at 7288 Central Parke Blvd, Mason, Ohio 45040. The Contractor shall do all the work and furnish all materials, except as herein otherwise specified, necessary or proper for performing and completing the work of the Contract. The methods, materials and appliances used, therefore, must be such as will produce the quality of work specified and ensure safety to the public and property. Access to abutting properties SHALL BE MAINTAINED at all times except for temporary periods as herein stated. In the event the Contractor will be temporarily blocking the access to any property during some period of construction, he must notify all residential or business occupants at least 24 hours before said blockage to allow them time to move any vehicles in or out. INTERFERENCE WITH EXISTING STRUCTURES The Contractor shall notify, at least forty-eight (48) hours before breaking ground, the Owner and all public service corporations whose wires, pipes, conduits and other structures may be affected by his operations. He shall likewise notify the Chief of the Fire Department and Police Department of the temporary blocking of any street. RIGHTS IN THE USE OF MATERIALS FOUND ON THE PROJECT SITE Existing headwall, wingwalls and culvert pipes, as noted on the plans, are to be used by the Contractor and placed as rock channel protection as noted on the plans. Old materials not reserved by the Owner and not to be used in the work will become the property of and must be disposed of by the Contractor. CLEAN-UP DURING CONSTRUCTION The Contractor shall at all times, maintain the job site and working areas in an orderly condition, reasonably clean and free of accumulations of dirt and debris. If the Contractor fails to maintain the job site and working area in a condition satisfactory to the Owner, the Owner shall have the right to employ others to do so at the Contractor's expense. The Contractor shall be responsible for clean up prior to the end of each working day. FINAL CLEAN UP As soon as portions of the work are ready for use, they shall be thoroughly cleaned by the Contractor of all dirt and rubbish, and cleared of all materials, forms, false work, temporary structures and equipment. The Contractor shall also clean out all sewer drains, inlets, manholes and other underground lines and structures built by him or affected by his work.
Award
Roads / Highways
$222,623.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2025
June 4, 2025
Weathervane Ln, Harrison, OH
Related To This Project
Harrison, OH
Bid Date: May 29 2025
Harrison, OH
Bid Date: Jun 26 2025
Harrison, OH
Bid Date: Jul 21 2025
Harrison, OH
Bid Date: Jul 11 2025
Harrison, OH
--
Harrison, OH
--
Harrison, OH
Bid Date: Nov 13 2025
Harrison, OH
Bid Date: Nov 18 2025
Harrison, OH
Bid Date: May 21 2025
Harrison, OH
Bid Date: May 01 2025
Harrison, OH
Bid Date: Apr 16 2025
Harrison, OH
Bid Date: May 21 2025
Harrison, OH
Bid Date: Mar 18 2025
Harrison, OH
Bid Date: Feb 27 2025
Harrison, OH
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
