Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 14, 2025 at 8:00 PM
Updated May 15, 2025
Site work for a civil project in Sheboygan, Wisconsin. Conceptual plans call for site work for a development; and water / sewer project.
The stormwater pond at the intersection of Geele Avenue and North 29th requires cleaning and restoration. This project will convert the existing dry pond to a wet pond to meet DNR requirements for total suspended solids in our annual permit. This will include control equipment to be purchased and installed in 2024 because current equipment on site is obsolete and unable to be repaired. As of May 14, 2025 ,This project is included in the city's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Conservation and Development
$1,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2028
Geele Ave & N 29th St, Sheboygan, WI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
