Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 17, 2025 at 8:00 PM
Updated July 18, 2025
Site work and paving for a road / highway in Golden Valley, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Project consists of applying an asphalt rejuvinating agent. The Bidder shall examine to their satisfaction the quantities of work to be done as determined from the Plans and Specifications. Quantities indicated by the Engineer on drawings or elsewhere are estimated only, and Bidders must rely on their own calculations. Bidders shall be thoroughly familiar with the Specifications, including all Special Conditions. Submission of a bid by the Bidder is a representation that the Bidder has visited the Work site, become generally familiar with local conditions under which the Work is to be performed, and correlated personal observations with requirements of the Contract Documents. Bidders shall inform themselves of the character and magnitude of work and the conditions under which the work is to be performed concerning the site of the work, the structure of the ground, the existence of surface and groundwater, availability of drainage, the obstacles which may be encountered, means of approach to the site, manner of delivering and handling materials, facilities of transporting and installing construction plant and equipment and all other relevant matters pertaining to the complete execution of this Contract. No plea of ignorance of conditions that exist or that may hereafter exist, or of difficulties that will be encountered in the execution of the work hereunder, as a result of failure to make necessary examination and investigations, will be accepted as a sufficient excuse for any failure or omission on the part of the Contractor to fulfill in every detail all the requirements of this Contract, or will be accepted as a basis for any claim whatsoever for extra compensation or for an extension of time. No Bidder may rely upon any statements or representations of any officer, agent, or employee of the City with reference to the conditions of the work or the character of the soil or other hazards that may be encountered in the course of construction.
Award
Roads / Highways
$264,165.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
July 11, 2025
Multiple Locations, Golden Valley, MN
Related To This Project
Golden Valley, MN
--
Golden Valley, MN
Bid Date: Jun 26 2025
Golden Valley, MN
Bid Date: Jul 03 2025
Golden Valley, MN
Bid Date: Mar 11 2021
Golden Valley, MN
Bid Date: Aug 15 2025
Golden Valley, MN
Bid Date: Feb 04 2021
Golden Valley, MN
Bid Date: Nov 20 2025
Golden Valley, MN
--
Golden Valley, MN
--
Golden Valley, MN
Bid Date: Mar 05 2025
Golden Valley, MN
Bid Date: Feb 20 2025
Golden Valley, MN
--
Golden Valley, MN
--
Golden Valley, MN
--
Golden Valley, MN
Bid Date: Feb 06 2019
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
